Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
-Supply-Of-Electrical-Materials-For-Maintenance-Of-Different-Major-Rli-Scheme-Under-Lalbagh-(a-m)-Sub-division-Under-Berhampore-i-(a-m)-Division>India -Supply-Of-Electrical-Materials-For-Maintenance-Of-Different-Major-Rli-Scheme-Under-Lalbagh-(a-m)-Sub-division-Under-Berhampore-i-(a-m)-Division>Ee(am)/ber-i (a-m)/ Materials /enit-11/2025-26 Gr09
Supply Of Electrical Materials For Maintenance Of Different Major Rli Scheme Under Lalbagh (a-m) Sub-division Under Berhampore-i (a-m) Division
-Supply-Of-Electrical-Materials-For-Maintenance-Of-Different-Major-Rli-Scheme-Under-Lalbagh-(a-m)-Sub-division-Under-Berhampore-i-(a-m)-Division>2025-12-18
Bangladesh Supply, Installation & Integration Of Smart Pre-payment Meter Including Necessary Communication Module Phase-1 Breb Item No J-42, J-44, J-42.2 2025-12-18
Bangladesh Grass Cutting And Cleaning Works Around The Office Building, Switchyard, Control Room, And Store Yard Of 33/11 Kv Charan Substation Under Sales & Distribution Division-kalihati, Bpdb, Tangail. 2025-12-18
India Construction Of Pre-engineered Building Pre-engineered Building 2025-12-18
India Construction Of (g+1) Storied Ogpl Building Ogpl Building 2025-12-18
India Solar Light Repairing 1 Nos. 2025-12-18
India Planning, Design And Construction Of 3 Nos Police Stations 6 Nos Police Posts And Womens Hostel Of Delhi Police Including All Civil E & M, Plumbing Horticulture And Development Work On Epc Mode-i Basis (design And Built). (sub Head- (i) Construction Of Po 2025-12-18
-1-To-21,24-Chidam-Mudi-Lane-Insufficient-Light-(street-Light-And-Flood-)>India -1-To-21,24-Chidam-Mudi-Lane-Insufficient-Light-(street-Light-And-Flood-)>Ltg/15/apas/wd-17/br-ii/ Z-i/25-26
1 To 21,24 Chidam Mudi Lane Insufficient Light (street Light And Flood )
-1-To-21,24-Chidam-Mudi-Lane-Insufficient-Light-(street-Light-And-Flood-)>2025-12-18
-Insufficient-Light-(flood-And-St-Light-)-At30/2-D.c.m-Street>India -Insufficient-Light-(flood-And-St-Light-)-At30/2-D.c.m-Street>Ltg/31/apas/wd-17/br-ii/ Z-i/25-26
Insufficient Light (flood And St Light ) At30/2 D.c.m Street
-Insufficient-Light-(flood-And-St-Light-)-At30/2-D.c.m-Street>2025-12-18
-Construction-Of-New-Building-Type-a-Building-Less-Sub-Health-Centre(shc)-Hwc-(aam)-Under-Pm-abhim-For-Fy-2025-26-For-Raina-Sc-Under-Raina-l-Block,-Purba-Bardhaman.>India -Construction-Of-New-Building-Type-a-Building-Less-Sub-Health-Centre(shc)-Hwc-(aam)-Under-Pm-abhim-For-Fy-2025-26-For-Raina-Sc-Under-Raina-l-Block,-Purba-Bardhaman.>Nit-12 Of 25-26, Sl-06
Construction Of New Building Type-a Building Less Sub Health Centre(shc) Hwc (aam) Under Pm-abhim For Fy 2025-26 For Raina Sc Under Raina-l Block, Purba Bardhaman.
-Construction-Of-New-Building-Type-a-Building-Less-Sub-Health-Centre(shc)-Hwc-(aam)-Under-Pm-abhim-For-Fy-2025-26-For-Raina-Sc-Under-Raina-l-Block,-Purba-Bardhaman.>2025-12-18
Whats app