Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Ttps Es Circle Mrt I Part Of Maintenance Works Related To Controls Protection In Unit I Ii Iii Pertaining To Sub Division Ii Of Mrt Division 1 For The Period From 01 04 2026 To 31 03 2027 2025-12-31
India Ttps Es Circle Mrt I A Part Of Preventive Maintenance Works Related To Fsss Sub Division Iv Mrt I In Units I Ii Iii For The Period From 01 04 2026 To 31 03 2027 2025-12-31
India Ttps Es Circle Mrt I A Preventive Maintenance Works Of Boiler Side Valves Damper Actuators Control Panels In Plant And Plant Auxiliaries Area Pertaining To Sub Dn I Of Mrt I In Units I Ii Iii For The Period From 01 04 2026 Upto 31 03 2027 2025-12-31
India Providing Manpower For The Operation Of The Transmission Line, Pumps-motors And Related Mechanical, Electrical And Civil Works And Minor Maintenance And Related Ancillary Works, And To Supply Necessary Consumables And Spare Parts At Mhaisal Lift Irri 2025-12-31
India Ttps Es Circle Mrt Ii Day To Day Routine Cleaning Maintenance Of Control Protection Panels And Testing Assistance Activities Pertaining To Generator Auxiliaries System 230kv Switchyard And Mrt Ii Lab Sub Division I Mrt Ii Of Unit 4 5 For T 2025-12-31
India E-tender For Interior -furnishing Electrical , Air-conditioning, Fire Safety And Cctv Works For Madanapalli, Andhra Pradesh 2025-12-31
India Technical Specification Of Switch Board Cabinet For Hog Compliant Lslrd Coaches. C&s Electric Tca3dn2, 2bd+ta1, Dn22/tc, A3dn22f, D+ta1dn, 22, S2k25, Feeder -a/b, Hooter Control Siemens 3rh2122, Auxiliary Contactor, With 24v Dc Coil, Aux. 2-no 1bb40, Abb 2025-12-31
India Supply Of 200 Nos Led 70 Watt Street Light 2025-12-31
India Erection Of Lt Line For Providing Power Supply To Cctv Camera Along With Illumination Of The 04 Kms Coal Corridor Road From Dlb Railway Siding No-02 To Nh Gate Entry Point At Lingaraj Ocp, Lingaraj Area 2025-12-31
India Ttps Es Circle Mrt I Part Of Cleaning Works Of Junction Boxes And Push Button Boxes Related To Turbine Side Valves In Plant Area Of Unit I Ii Iii For The Period From 01 04 2026 To 31 032027 2025-12-31
Whats app