Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
United Kingdom Electrical Installation Condition Report Eicr Inspections & Related Works - 2025 2025-12-17
India Single Phase Solar Smart Meters (with Load Switch Or Without Load Switch) Single Phase Solar Smart Meters (with Load Switch Or With Out Load Switch) 2025-12-17
-Construction-Of-Cultural-Stage-At-Kapasita-Nayek-Para-Apas/01/237/171/0006>India -Construction-Of-Cultural-Stage-At-Kapasita-Nayek-Para-Apas/01/237/171/0006>Construction Of Cultural Stage At Kapasita Nayekpara Apas/01/237/171/0006
Construction Of Cultural Stage At Kapasita Nayek Para Apas/01/237/171/0006
-Construction-Of-Cultural-Stage-At-Kapasita-Nayek-Para-Apas/01/237/171/0006>2025-12-17
-Annual-Maintenance-Work-Related-With-Lighting-System-And-Fire-Detection-System-Installed-At-Suri-Sadar-Hospital-Under-Birbhum-Electrical-Division,-Pwd,-During-The-Period-For-365-Days,-Including-Holidays.>India -Annual-Maintenance-Work-Related-With-Lighting-System-And-Fire-Detection-System-Installed-At-Suri-Sadar-Hospital-Under-Birbhum-Electrical-Division,-Pwd,-During-The-Period-For-365-Days,-Including-Holidays.>Wbpwd/ssewec /bred /niq-31 /2025-26
Annual Maintenance Work Related With Lighting System And Fire Detection System Installed At Suri Sadar Hospital Under Birbhum Electrical Division, Pwd, During The Period For 365 Days, Including Holidays.
-Annual-Maintenance-Work-Related-With-Lighting-System-And-Fire-Detection-System-Installed-At-Suri-Sadar-Hospital-Under-Birbhum-Electrical-Division,-Pwd,-During-The-Period-For-365-Days,-Including-Holidays.>2025-12-17
India 50 No Of Street Light In Harit Dakshin Under Harit Gp Ps 216 At Booth No-216, Mouza-harit, Jl.no.-170, Under Harit Gram Panchayat, Under Polba-dadpur Development Block, Hooghly. Street Light 2025-12-17
India Installation Of Street Light (50 Nos) At Booth No- 179 - Rukeshapur Prathamik Bidyalay Under Balagarh Development Block. Street Light 2025-12-17
India Supply Of L&t Make Power Contractors & Add-on Blocks For Ac Plant & Ecs System And "fluke" Make Clamp Meter Of Stage-ii And Earth Resistance Tester For Stage-v/dr.nttps. 2025-12-17
India Tender Invited For Single Phase Solar Smart Meters (with Load Switch Or With Out Load Switch). 2025-12-17
India Light Fitting And Repairing At 4 Electric Poll 1.ashoke Rabidas, 2.chayan Rabidas, 3.mantu Mandal, 4.aloke Mandal. Scheme Idapas/01/049/134/0006 2025-12-17
India Repair Of Wash Rooms In Control Room And Guest House And Partition For Separating 415 Ah Battery Sets From Control Room At 400 Kv Dichpally; Providing Line Differential Protection On 220 Kv Renjal – 132kv Bhagepally I & Ii Circuits At 132 Kvss Bhagepally. 2025-12-17
Whats app