Filter Search


Infrastructure-and-construction


Location Summary Deadline
India Cconstruction Of Walkway In Park (ram Katha Park) Near H. No. 141 In Gh-2, Block In Paschim Vihar Ward No. 67/kpz 2023-01-12
India Construction Of Walkway In Park Near H. No. 20 In Bg-2 Block In Paschim Vihar Ward No. 67/kpz 2023-01-12
India Restoration Of Cut #*. Restoration Of Road Cut Made By Telesonic Networks In Ac-block, Shalimar Bagh (s), C-63/kpz 2023-01-12
India Supply, Fabrication, Erection Of 05 Nos. Of Scouring Sluice Gate For Anti Sea Erosion Work To Protect Saline Embankment And Mouth Of River Baudha( From Sunapur Bhagyadevi Temple To Fishery Jetty And Anantaraypur To Patisonepur) At Inlet Rd 340m In Ga 2023-01-19
India Fabrication, Transportation And Erection Of C/r Gate And Hoisting System At 11.520km Of Narsinghpur Branch Canal Under Superintending Engineer, Rangali Right Canal Division-v, Athagarg, Khuntuni For The Year-2021-22 2023-01-19
India Making Decorative Illumination Arrangement Along The Road From K1 Bus Stand To Old Bus Stand At Ganga Sagar In Connection With Ganga Sagar Mela - 2023 2023-01-19
India Providing Laser Radiating Lighting With Truss Arrangement For Road No. 2 In Connection With Ganga Sagar Mela 2023. 2023-01-20
India Providing Bamboo Structure With Decorative Led Lighting Arrangement And Temporary Illumination Arrangement At Different Places Including Emergency Illumination Of Road No 2 And Sea Beach Area In Connection With Ganga Sagar Mela 2023 2023-01-21
India Complete Fresh Modular Type Electrical Wiring With Modular Fittings In Gm Unit Main Building (complete Ground Floor And 1st Floor) With Provision Of Service Wire Under Hazaribagh Area 2023-01-28
India Making Temporary Illumination Arrangement Including Construction Of Temporary Structure At Ganga Sagar Main Mela Ground In Connection With Ganga Sagar Mela - 2023 2023-02-04
Whats app