Filter Search


Transportation


Location Summary Deadline
India Supply Of Fabricated Main Pull Rod Long Assembly And Fabricated Main Pull Rod Short Assembly For Bvcm Wagon #*. Fabricated Main Pull Rod Long Assembly For Bvcm Wagon To Asrw Drg No.bvcm-549,b,c [ Warranty Period: 30 Months After The Date Of Delivery ]fabr 2024-05-18
India Supply Of Hinged Cover For Blind Socket Assembly #*. Hinged Cover For Blind Socket Assembly Of Zs Coupler 500 Amps For Lhb Coaches Along With Pinand Spring As Per Rdso Spec.rdso/pe/spec/ac/0177 Rev -0 2013. As Per Rdso Approved Panel. Make [warranty Perio 2024-05-18
India Supply Of Ioh Kit For E-70 Brake System Of Wap7 #*. Ioh Kit For E-70 Brake System Of Wap7 Locomotives. Set Consists Of 19 Items As Per Annexureenclosed. [ Warranty Period: 30 Months After The Date Of Delivery ] 2024-05-18
India Supply Of Ring Gauge For Pinion. #*. Ring Gauge For Pinion Of Wag-9/wag-7 Locos As Per Rdso Drawing No. Skel-5043 Alt-0 Andsupply With Calibration Certificate Issued From Nabl/govt. Approved Test Lab House & Packed In A Suitablewooden Box. [ Warranty Peri 2024-05-18
India Supply Of Gasket- Bottom Header To Tank As Per Blw Drg. No. 9570895 Alt- B? Or Latest To Emd Partno.9570895 & Blw Pt. No. 17270881. Drawing Attached. Note: Test Certificate & Guarantee/warrantycertificate To Be Provided Along With The Supply. [ Warranty P 2024-05-18
India Supply Of Crew Fan (pos No 69.7) As Per Clw Spec. No.clw/es/3/0110 Alt-e Or Latest And Clw Drg. No. Clw/es/3/sk-1/0110 Alt-c & Clw/es/3/sk-2/0110 Alt-c And Clw/es/3/sk- 3/0110 Alt-d #*. Crew Fan (pos No 69.7) As Per Clw Spec. No.clw/es/3/0110 Alt-e Or Lat 2024-05-18
India Supply Of Set Of Brake Pad For Disc Brake System For Lhb Coaches Etc. #*. Set Of Brake Pad For Disc Brake System Of Lhb Coaches (one Left Hand And One Right Hand).confirming To Rdso Spef. No.rdso/2013/cg-01 Acceptable Designation Of Type Of Brake Pad, 'ju 2024-05-18
India Supply Of Heavy Duty Hydraulic Extractor For Jammed Erc 10(t) As Per R.d.s.o Specification No Tm/sm/6 Dated 08.05.1991 Or Latest. #*. Heavy Duty Hydraulic Extractor For Jammed Erc 10(t) As Per R.d.s.o Specification No Tm/sm/6dated 08.05.1991 Or Latest. [ 2024-05-18
India Supply Of Glass Size: 8x420x900mm For Compartment Door #*. Glass Size: 8x420x900mm For Compartment Door Of Ac Coaches, Item No.2 Torcfdrg.no.cc56408, Item No.2, Alt.'f'. [ Warranty Period: 30 Months After The Date Of Delivery ] 2024-05-18
India Supply Of One Inch Hose Coupling #*. One Inch Hose Coupling To Icf Drg. No. T-6-3-057 Alt. 'f'/55. Mtrl And Specn Asper Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] 2024-05-18
Whats app