Filter Search


Transportation


Location Summary Deadline
Portugal Support To The Community Involved In The Defoliation Points - Body Of God Feast - Flower Carpet - Lot 4 contract Date: : 17-06-2025 contract Price: 6.702,28 € deadline: 1 Dias place Of Execution: Portugal, Porto, Vila Do Conde.support To The Community Inv 2025-09-17
Portugal Support To The Community Involved In The Defoliation Points - Body Of God Feast - Flower Carpet - Lot 3 contract Date: : 17-06-2025 contract Price: 6.000,00 € deadline: 1 Dias place Of Execution: Portugal, Porto, Vila Do Conde.support To The Community Inv 2025-09-17
Portugal Support To The Community Involved In The Defoliation Points - Body Of God Feast - Flower Carpet - Lot 2 contract Date: : 17-06-2025 contract Price: 7.461,79 € deadline: 1 Dias place Of Execution: Portugal, Porto, Vila Do Conde.support To The Community Inv 2025-09-17
Portugal Support To The Community Involved In The Defoliation Points - Body Of God Feast - Flores Rug contract Date: : 17-06-2025 contract Price: 13.611,00 € deadline: 1 Dias place Of Execution: Portugal, Porto, Vila Do Conde.support To The Community Involved In T 2025-09-17
India Bolt For Primary Vertical Stop .#* Bolt For Primary Vertical Stop. As Per Rcf Drg. Lw-01116, Alt-nil. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-17
India Supply Of Set Of Rubber Profile .#* Supply Of Set Of Rubber Profile For Main Door, Consisting Of 03 Items As Per 1) Drg No. 840-204 Blatt -01 Alt- Nil / Qty/kit - 4 Nos 2) Drg No. 840-203 Blatt -01 Alt- Nil / Qty/kit - 4 Nos 3) Drg No. 840-202 Blatt -01 A 2025-09-17
India Window Lock Assembly .#* Window Lock Assembly (male & Female) For Lhb Non-ac Coach As Per Drg. No. Judw/mech/23-806 Alt-nil. [ Warranty Period: 30 Months After the Date Of Delivery ] ] 2025-09-17
India Handle For Single Piece Side Lower Berth .#* Handle For Single Piece Side Lower Berth Of Lhb Type Coaches. As Per Drawing No. Sk.no. Llh-06/2022. [ Warranty Period: 30 Months After The date Of Delivery ] ] 2025-09-17
India Door Leaf Assembly .#* Door Leaf Assembly To Rcf Drg.no.mi007752, Alt.nil. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-17
India Supply Of Door Mechanism Complete .#* Supply Of Door Mechanism Complete As Per Rcf Drg.no.-lw56353, Alt.-a, Item No.-1 To 27, Material Specification As Per Drawing. Make To Be As per Rdso Spec. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-17
Whats app