Filter Search


Transportation


Location Summary Deadline
India Day To Day Electrical Maintenances Of O/h Line (415v) Breakdown Job, External Street Lighting Maintenance Job, Minor Maintenance Of Transformer And Switch In Public Utility Building Along With Power Supply Job During Round The Clock Of V.n.colony 2026-03-20
India Supply Of 82667147: 2025-26 (ami No. Gr. 32 N 75) Sulfolyser, Pack Size - 1 X 5 Litres / Pack Make- Sysmex 2026-03-20
India Supply Of 33501506: Disc, As Per Drawing: 1267576 Ver. 00 And Specification No. En1.0570;10025/29 Or Is:5517-1993 Gr 20c15(m), Packing Instruction: Suitably Packed In Jute Bags 2026-03-20
India Supply Of 33500034: Traction Center Elastic Joint For Fiat Bogie Of Lhb Coaches To Fiat Drg.no. C53973 Ref.bred 8397, Rev-2r1 (firm's. No.98.2.00119 B/pirelli), Spec.no.t.s.17.533 100 00, T.s.17.617.100 02 , Mdts-148 Re 2026-03-20
India Supply Of Cast Turbo Inlet Scroll Assembly (machined) #*. Cast Turbo Inlet Scroll Assembly (machined) 16081481 Nil Spec:misc:752 Rev.- Nil [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal 2026-03-20
India Supply Of Cast Turbo Inlet Scroll Assembly (machined) #*. Cast Turbo Inlet Scroll Assembly (machined) 16081481 Nil Spec:misc:752 Rev.- Nil [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal 2026-03-20
India Liner 75x17x4 Mm For Bolster Column Outer Gib .#* Liner 75x17x4 Mm For Bolster Column Outer Gib . Drawing No :- Fig. 41, Para 5.4.3 Of G- 95 (rev.1, With Amend. No. 5). Mat. & Spec :(1) Wd-21-casnub-22 Nlb-bogie-93, (rev. 2, Amend. No. 6). (2) Is : 3885, 2026-03-20
India Liner 105x24x5 Mm For Bolster Land Surface .#* Liner 105x24x5 Mm For Bolster Land Surface . Drawing No :- Fig.40, Para 5.4.2 Of G-95 ( rev. 1) With Amend. No. 5. Mat. & Spec : (i) Wd-21-casnub-22nlb-bogie-93 (rev. 2, Amend. No. 6) (ii) is : 3885 Pt. 1, Gr 2026-03-20
India Tender Invited For Main Transformer 6531 Kva #*. Main Transformer 6531 Kva For Wag-9 Loco. As Per Specn. Main Tranformer Spec. No. Clw/es/3/0456/k Or Latest & Str No. Clw/c-d&d/str/001 Rev.1 Or Latest. Transformer Tank Str No .rdso/2013/el/ Str/0079 Rev.0 2026-03-20
India Safety Chain Complete .#* Safety Chain Complete, As Per Drawing: Emu/m-3-2-070 Col-1 Alt.br, Packing Instr uction: Suitably Packed In Jute Bags [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-03-20
Whats app