Filter Search


Transportation


Location Summary Deadline
India Supply Of 33615779: Set Of Ermeto Fittings For Plumbing Of Lhb Pc Coaches., As Per Drawing: Mplefpcplubfur Version 3, Packing Instruction: Set Of Ermeto Fittings:- Each Item Of The Set Should Be Packed Individually After 2026-01-15
India Supply Of 29168107: Set Of Spares For E-70 Equipment Manifold Assly. As Per Ftrtipl Part No. 790.016.301 To D&m Part No. Rkab 519-t25 Of E-70 Brake System Of Wag-9 Loco. Firm's Offer:poh Kitfor E70 Br. Control Unit To Ft 2026-01-15
India Supply Of 25328311: Set Of Pins For Bk. Rigging Of Wap1/p4 Locos Consisting Of 06 Items In Each Set To Mn Steel To Irs-r-65-78. [1] Pin For Bk. Head Hanger Lever. [in Board] As Per Clw's Drg.no:-03/4/19/76 Alt.6 For Qty 2026-01-15
India Supply Of 45978311: Supply, Installation, And Commissioning Of Hydraulically Operated Lifting And Swivelling Platform For Over Head Equipment Inspection Car To Specn. No. Icf/elec/ohe/001, Rev.-01 With Annexure I & Cs- 2026-01-15
India Ebl -5 Blending Unit Assembly .#* Ebl -5 Blending Unit Assembly For E-70 Brake System Of Three Phase Locos Ftrtipl Pt No 006113000 C-ab 1578-w398. [ Warranty period: 30 Months After The Date Of Delivery ] ] 2026-01-15
India Aoh Kit For Rr20100/rr20100 Cg(m) As Per Elgi Part No.072403619 .#* Aoh Kit For Rr20100/rr20100 Cg(m) As Per Elgi Part No.072403619 (as Per Annexure) . [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Cate 2026-01-15
India Tender Invited For Cooling Pipe [cooling Coil] Crcc Part No 23069037 Make Crcc Or Own Make As Per Sample[ Warranty Period: 9 Months After The Date Of Delivery ] ] 2026-01-15
India Supply Of Manufacture And Supply Of Wider Bridge Approach Prestressed Concrete Sleepers For B.g. 60kg (uic)/60e1/52 Kg Running Rail To Rdso's Drg. No. T-8970, Alt-1 And T-8971 To T-8978, Alt-1 As Per Irs Specification Sl. No. T-39 (6th Revision March-21), 2026-01-15
India Vande Bharat - Set Of Spares For 25 Kv .#* Vande Bharat - Set Of Spares For 25 Kv Pantograph Model Wbl 22.03 Of Make Sch unk For Vande Bharat Version 2.0 As Per Attached Annexure A. Accepted Make - Schunk Only . Material To Be Procurred From Oem Or Their 2026-01-15
India Overhauling Kit For Stop Cock (part No. .#* Overhauling Kit For Stop Cock (part No.i88738)& Kbi Kit No.xki/kit/02483 Of Electric Ccb. (one Set consisting Of 14 Items). Full Details As Per Attached Document. [ Warranty Period: 30 Months After The Date Of d 2026-01-15
Whats app