Filter Search


Transportation


Location Summary Deadline
India Set Consist Of Two Item 1) Tubing 1/4 Od [set Consist Of Two Item 1) Tubing 1/4 Od,5 inch Emd Part No. 8098593 Qty-01 No/set. 2) Tube Assembly Oil Pressure Line To governor Emd Part No. 9524851 Qty 01 No/set. Warranty Period 30 Months From The date Of Sup 2025-12-16
India Tube Assembly As Per Emd Part No.9524657 .#* Tube Assembly As Per Emd Part No.9524657 & Blw Part No.16360114 Consisting Of Turbing 3/8 To Od Emd Part No.8098594 Qty-01 No. And Nut 3/8 To Emd Part No.121758 Qty-02 Nos. As Per Drawin g No. 9524657. [ Warran 2025-12-16
India Ctrb Puller Cum Installer Of Capacity 100/70 Ton. .#* Ctrb Puller Cum Installer Of Capacity 100/70 Ton Of Class E & K With 7" Touch Hmi. As Per Tec hnical Specification (annexure-a). Suitable Make- Perfect, Sumanglam, Precision, Macmen Or Similar As Per a 2025-12-16
India Brake Cyl Seal 10 .#* Brake Cyl Seal 10 [part No:90218ds]make: Plasser [ Warranty Period: 12 Months After T he Date Of Delivery ] ] 2025-12-16
India Lower Rubber Washer For Axle Box Guide .#* Lower Rubber Washer For Axle Box Guide Arrangement To Icf Drg. No. Emu/m-0-1-008, alt .s /6 As Per Rdso Spec. No. R-64/98, Rev.2 Of Dec.2005. [ Warranty Period: 30 Months After The date Of Delivery ] [quantity To 2025-12-16
India Ioh Kit For Throttle Vavle .#* Ioh Kit For Throttle Vavle Consisting Of 11 Items (item Sr No 1 To 11) As Per Annexure ] 2025-12-16
India Packing Saddle .#* Packing Saddle (1174) Spec:ti/spc/ohe/fittings/0130-10/13-rev- 1. Make- Core/rdso Appr oved Sources Only [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-16
qty:19
>India
qty:19
>Tender Invited For Foot Pump For Boat Sillinger
qty:19
qty:19
>2025-12-16
Uruguay Contract Awarded For: Corresponds As I Send 246799 - 254193 .corresponds As I Send 246799 - 254193 2025-12-16
Uruguay Contract Awarded For: Spinography .spinography 2025-12-16
Whats app