Filter Search


Transportation


Location Summary Deadline
India Ioh Kit For Speed Sensor Type T-813- M Of M/s Medha Make Consisting Of 08 items As Under: [1] Ss Drive Dog-m Medha Part No. Sp 813202002 Qty. 01 No. [2] Drive Dog Spring Dowel. Part No.sp813232014 Qty. 01 No. [3] Set Of bearing Fort T813- M (02 No.) Part 2026-05-18
India Overhauling Kit For Piston Valve To Kbil .part No. I98866 Consisting Of 20 Items As per Annexure Enclosed For Ccb-1.5 System Of Hhp Loco. .#* Overhauling Kit For Piston Valve To Kbil .part No. I98866 Consisting Of 20 Items As Per Annex ure Enclosed For Cc 2026-05-18
India Leader Nut (for Slack Adjuster Type Irsa-600) . Drawing No Wd 82064 S 02 Rc , alt. 7 Item No. 1. Spec. No 07 Abr 92, Amend. No. 5 .#* Leader Nut (for Slack Adjuster Type Irsa-600) Drawing No Wd 82064 S 02 Rc Alt. 7 Ite m No. 1. Spec. No 07-abr-92, Amend. 2026-05-18
India Spring Seat Liner .#* Spring Seat Liner, As Per Drg No.wr-ccg-el/ 4-bg-008 Ref 3,alt 2. Specn: 01/2/15 /5 F222/ [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-05-18
India Supply Of 38125584: Top Side Bearer Liner For Boxn Wagon. Drawing No.: Rdso's Drg. No. Wd- 85079-s-1, Alt. 16, Item No.12. Material And Specification: As Per Drawing (is: 3885 (part I) :1992 (rev. 2), Amend. No. 1 Of Jan 2026-05-18
Bangladesh contract Value (taka): 14086915.210 date Of Notification Of Award: 02-dec-2025 11-dec-2025 proposed Date Of Contract Completion: 18-may-2026. 2026-05-18
Bangladesh contract Value (taka): 12251036.600 date Of Notification Of Award: 30-nov-2025 08-dec-2025 proposed Date Of Contract Completion: 18-may-2026. 2026-05-18
Bangladesh contract Value (taka): 14685981.752 date Of Notification Of Award: 30-nov-2025 08-dec-2025 proposed Date Of Contract Completion: 18-may-2026. 2026-05-18
Bangladesh contract Value (taka): 10739761.533 date Of Notification Of Award: 25-nov-2025 07-dec-2025 proposed Date Of Contract Completion: 18-may-2026. 2026-05-18
Bangladesh contract Value (taka): 18767294.469 date Of Notification Of Award: 30-nov-2025 10-dec-2025 proposed Date Of Contract Completion: 18-may-2026. 2026-05-18
Whats app