Filter Search


Transportation


Location Summary Deadline
India Cab Heater / Ventilation Assly .#* Cab Heater / Ventilation Assly (consisting Of: Items, As Per Scope Of Supply A ttached In Specn.) To Clw Specn./drg. No. Clw/es/3/0109/g. [ Warranty Period: 30 Months Aft er The Date Of Delivery ] [quantity Tolerance (+/ 2025-12-31
India Supply Of Tube Cu. 38.1 Mm(1 1/2") O/dx1.651 Mm #*. Tube Cu. 38.1 Mm(1 1/2") O/dx1.651 Mm Wt X 6 Mtr. Lg (weight/mtr= 1.682 Kg) Cat No. T/9/0003a Spec:clw/ms/3/030 Alt.-13 [ Warranty Period: 72 Months After The Date Of Delivery ][quantity Tolerance (+/-): 2025-12-31
India Supply Of 29120159: Stainless Steel Sheets, Plates, Bars, And Flats To Set List No. El29120159 Rev.-03, Specification No. Clw/ms/3/039 Alt.-7, And Str No. Clw/2015/eldo/m/str/59 Rev.-0 Make :- Self 2025-12-31
India Side Wall Assembly .#* Side Wall Assembly For Wag-9hc Loco As Per Drg.no. 29171040 Alt B As Per Specn. Clw/ms/ 3/0154 Alt.2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-31
India Side Wall Assembly .#* Side Wall Assembly For Wag-9hc Loco As Per Drg.no. 29171040 Alt B As Per Specn. Clw/ms/ 3/0154 Alt.2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-31
India Supply Of 29860015: Master Controller For 3-phase Electric Loco To Clw Spec. No. Clw/es/3/0031/alt.- J, Modification Sheet No. Rdso/2012/el/ms/0419, Rev.-0, Dated 20/12/2012 And Str No. Clw/2022/c-d&d/e/str/03 Rev.-1. N 2025-12-31
India Supply Of 60090030: Fish Plate For 52 Kg Rail (01 Metre Long) To Rdso Drawing No: T-5915 With Latest Alteration & Specification As Per Irs: T-1-2021 (first Revision) And Str Compliance : Tdg-0040 Version 3.0 Effective Fr 2025-12-31
India Bearing To Skf Part No Ge 70 Txe-2ls Or Equivalent For Fiat Bogie Of Lhb Coaches As Per Fiat Drg.no 1268555 Alt 00r [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variat 2025-12-31
India Tender Invited For Underframe Complete For Amrit Bharat Scn,gs,slr #*. Underframe Complete For Lhb Scn Amrit Bharat Coaches Note:-(1)firm Shall Collect All Latest/final Drawings Before Manufacturing. There May Be Minor Modification In Design. (2)special C 2025-12-31
India Tender Invited For Underframe Complete For Amrit Bharat Scn,gs,slr #*. Underframe Complete For Lhb Scn Amrit Bharat Coaches Note:-(1)firm Shall Collect All Latest/final Drawings Before Manufacturing. There May Be Minor Modification In Design. (2)special C 2025-12-31
Whats app