Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
China Deliver A Communications Based Train Control (cbtc) Metro In China, 2037-11-30
Canada Fleet Management™ Program (fmp®) For 22 Pt6c-67c Engines That Will Power The Airline's Fleet Of Leonardo Aw139 Helicopters 2037-11-30
United States Energy Improvements At Naval Air Facility Atsugi, Commander Fleet Activities Yokosuka And Commander Fleet Activities Sasebo. 2037-11-30
Japan Smart Digital City Information Panels (cip) 2037-12-31
United States Develop A 5-mw Solar Power Plant As Part Of Massachusetts' New Smart (solar Massachusetts Renewable Target) Programme 2038-02-28
United Arab Emirates Install A Rooftop Solar Power System For Al Abbar Aluminium 2038-03-31
India 29740230-igbt Based 3-phase Drive Propulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (m V B) As Per Iec-61375, Terminal Bracket, Bus Bar Link And Cu Braid Requ 2038-04-26
India 29740230-igbt Based 3-phase Drive Propulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (m V B) As Per Iec-61375, Terminal Bracket, Bus Bar Link And Cu Braid Requ 2038-04-26
India Supply, Installation, Testing And Commissioning Of 3x100tr Screw Chillers With Vfd Energy Efficient In Place Of Old Age 3x80tr Reciprocating Chillers Including Associated Accessories Installed At Shas 2038-05-11
United States Energy Perform Contr Boiler Replmnt, Lighting&ventilation Improvements 2038-07-01
Whats app