Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Portugal Conclusion Of A Pilot Energy Efficiency Management Contract, Under Decree-law No. 29/2011, Of February 28, For The Implementation Of Measures To Improve Energy Efficiency In The "public Lighting System" (sip) In The Municipality Of Vila Nova De Gaia. 2029-08-05
India Installation Of Solar Lights At Bikna Village, Mouza - Bikna Vi, Vii, Viii, J.l. No-235, Gp- Bikna, Block- Bankura-ii, Dist- Bankura, Fund - 5th Sfc Tied 2023-24 Sl. No.-11 2029-08-13
India Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run And Commissioning Of 2 X 6.3 Mva, 33/11 Kv Substation On Turnkey Basis At Manikpur Ocp, Korba Area, Secl 2029-08-14
India Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run And Commissioning Of 2x10 Mva,33kv/6.6kv Substation On Turnkey Basis At Baroud Ocp, Raigarh Area, Secl 2029-08-14
India Pre-engineered Turnkey Execution For Construction Of 33 Kv Double Circuit Overhead Transmission Line From 220/33kv Garjanbahal Substation To 33/6.6 Kv Project Substation-i At Siarmal Ocp, Mahalaxmi Area Including Maintenance During Dlp (1st Retender) 2029-08-14
India Provision Of Automatic Switching Of Lights In Multi Level Car Parkt - 2 At Nscbi Airport, Kolkata 2029-08-17
United States Exc Genset Platinum Plus Parts And Labor, 108 Months 2029-08-19
India Provn Of Card Based Prepaid Energy Meter For Private Parties At Cad Pulgaon Under Ge Pulgaon 2029-08-24
Australia Grdc Grains Research Updates - Output 2, Online Updates 2029-08-30
United States Provide Services To The Steam Turbines, Generators And Auxiliary System 2029-08-31
Whats app