Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Australia Core Network Replacement 2025-07-14
India Supply Of Flexible Shunt & Mobile Contact Lever Assembly For Motor Contactor As Per Clw Drg. No. 2twd.112.030, Alt.-7. #*. Flexible Shunt & Mobile Contact Lever Assembly For Motor Contactor As Per Clw Drg. No. 2twd.112.030, Alt.-7 [ Warranty Period: 30 Mo 2025-07-14
India Supply Of Inverter Module For Cgl Make 3x130 Kva Igbt Aux. Conv As Per Cgl Material Code. Acigbt- Inverter. #*. Inverter Module For Cgl Make 3x130 Kva Igbt Aux. Conv As Per Cgl Material Code. Acigbt- Inverter. [ Warranty Period: 30 Months After The Date O 2025-07-14
India Supply Of Input, Output & Power Cable Assemblies With Connectors For Vcu1 #*. Input, Output & Power Cable Assemblies With Connectors For Vcu1 As Per M/s. Medha Code No. Sp628v2701001. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-14
India Supply Of Sub Kit Ioh-1 For Tap Changer Type N-32 As Per Annexure R1 Of Rdso Tc No. Rdso/2010/el/tc/0102 Rev-02 Dt. 06.08.2021. One Set Consisting Of 57+41 (hardware Items As Per Annexure Ioh-hw-1 #*. Sub Kit Ioh-1 For Tap Changer Type N-32 As Per Annexur 2025-07-14
India Providing Internal Electrification And Amenities To Clinical Sciences Block At College Of Veterinary Science, Tirupati In Tirupati District 2025-07-14
India Fabrication, Supply And Installation Of Auto Capacitor Lt Main Panel Board Structure Along With Mpp/mp Type Shunt Capacitor (banks For Improving Power Factor To Raw Water Pump Houses At Head Water Works In Gudivada Municipality 2025-07-14
India Rfs For Assured Peak Supply Of 8000 Mwh (2000 Mw X 4 Hrs.) From Ists-connected Re Projects (seci-fdre-vi) 2025-07-14
India Proposed Construction Of Furniture And Electrification Work For N.p. Owned Study Center Lonar Municipal Council For Municipal Council Lonar. 2025-07-14
India Kanjikuzhygp24-25-konnamveli Kaniyakulam Road Maintenance Wrad 10 2025-07-14
Whats app