Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Civil Work 15 Th Gp #*. Ciwil Work 15 Th Gp Mehtakheda. 2025-07-12
India Fabrication And Erection Of Ss Pipeline In Pulpmill And Clo2 Plant At Tnpl Unit - Ii. 2025-07-12
India Supply Of Ups, 1-ph To 1-ph, System With 2 X 4680 Vah Minimum Back-up Battery With Accessories, Three Years Warranty Having Minimum Technical Specification, Sitc Of 01 Kva Online Ups, 1-ph To 1-ph, System With Inbuilt 168 Vah Minimum Back-up Battery Other 2025-07-12
India Sitc Of Stackable Layer 3, 24 Port, Full Managed Only, 1ru, Ge Switch, Three Years Warranty With Pe 2025-07-12
India Sitc Of Stackable Layer 3, 24 Port, Full Managed Only, 1ru, Ge Switch, Three Years Warranty With Pe 2025-07-12
Bangladesh Contract Award For: Construction Of 25.839 Km Testing Commissioning & Conversion Of Electric Line (lt To Ht/ht Single Phase To Three Phase/installation Of Insulated Conductor) Under The Geographical Area Of Barisal Pbs-1. contract Value (taka): 3821983.2 2025-07-12
Bangladesh Contract Award For: Construction Of 27.774 Km 11 Kv Electric Distribution Line (new/up-gradation/underground) Under The Geographical Area Of Barishal Pbs-2. contract Value (taka): 6641950.650 no. Of Tenders/proposals Sold: 77 no. Of Tenders/proposals R 2025-07-12
India Ht/ Lt Line Shifting Work For Construction Of Bager-harigargh-mandawar-bakani Jhalawar Up To Mp Border Km 0/00to 19/500 (sh-89 ) #* Electric Work 2025-07-12
India Repair Renewals Periodical Maintenance Of Outdoor Indoor Lt Panels Transformer Vcb Feeder Pillar Box Servo Stabilizer And Allied Works At Different Technical Domestic And Various Sub Stn Area At Af Stn Singarsi Under Age I Af Singarsi 2025-07-12
qty:114
>India
qty:114
>Supply Of Switch Board, Sieve, Patila 26 Inch, Karchi, Flooring Sheet 12x12, Patila 13 Inch, Electric Holder, Capacitor 4 Mfd, 3 Pin Plug, 5 Amp Switch Board, Fuel Pump, Exhaust Fan, Wall Sticker, Kadhai Medium, Fire Ball
qty:114
qty:114
>2025-07-12
Whats app