Filter Search


Asia


Location Summary Deadline
India Collection Of User Fee On Agra Inner Ring Road Phase Kuberpur To Fatehabad Road At Rahankalan Toll Plaza Km.2 600 For The Period Of 24 Months 2 Years 2024-04-12
India Supplying, Laying Of Clear Water Rising Main From Dtw To Different Ohr For Different Zone With Different Diameter D.i.(k-9) For Water Supply Scheme Within Sonamukhi Municipality, Under Amrut 2.0 Scheme. 2024-04-12
India Construction Work Of Non-residential Buildings Of Newly Created Tehsil-obra, District- 2024-04-15
India Construction Work Of Residential Buildings Of Newly Created Tehsil-obra, District- Sonbhadra 2024-04-15
-26500-Nos.-Of-Lt-Single-Phase-Bi-directional-Energy-Meters,-27500-Nos-Of-Lt-Three-Phase-Bi-directional-Energy-Meters,-400-Nos.-Of-Lt-3-Ph-Ct-Operated-Bi-directional-Energy-Meters-And-150>India -26500-Nos.-Of-Lt-Single-Phase-Bi-directional-Energy-Meters,-27500-Nos-Of-Lt-Three-Phase-Bi-directional-Energy-Meters,-400-Nos.-Of-Lt-3-Ph-Ct-Operated-Bi-directional-Energy-Meters-And-150>Supply Of Various Types Of Bi-directional Static Energy Meters
26500 Nos. Of Lt Single Phase Bi-directional Energy Meters, 27500 Nos Of Lt Three Phase Bi-directional Energy Meters, 400 Nos. Of Lt 3 Ph Ct Operated Bi-directional Energy Meters And 150
-26500-Nos.-Of-Lt-Single-Phase-Bi-directional-Energy-Meters,-27500-Nos-Of-Lt-Three-Phase-Bi-directional-Energy-Meters,-400-Nos.-Of-Lt-3-Ph-Ct-Operated-Bi-directional-Energy-Meters-And-150>2024-04-20
India Supply Of Automated Electrophoresis Apparatus With All Accessories Type C 2024-04-20
India Supply Of Neuro Musculature Simulator Tof Monitor With Accelerometer. 2024-04-20
India Supply Of Sterile Connecting Device. 2024-04-20
India Supply Of C Arm Compatible Radioluctant Top Table (electrohydraulic Operating Table For Spine) 2024-04-20
India Construction Of Pareeksha Bhavan At Ssus Head Quarters, Kalady (civil And Plumbing Works) 2024-04-30
Whats app