Filter Search


Asia-Pacific


Location Summary Deadline
Japan Government Building Power (ac 3-phase 3-wire System, Supply Voltage 6,000 Volts) Planned Power Usage: 6,330,191kwh 2024-06-12
-Qty-:-45
>India
-Qty-:-45
>Supply Of 45% Alumina Castable
Qty : 45
-Qty-:-45
>2024-06-12
India Expression Of Interest For Assignment Of Nrra Of Lakshmi Subbaiaah Tex Private Limited (in Liquidation). 2024-06-12
-Post-Assembly-Contact-As-Per-Drg.no.-8435874-Specn:-Drawing-No.-8435874-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>India -Post-Assembly-Contact-As-Per-Drg.no.-8435874-Specn:-Drawing-No.-8435874-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>Supply Of Post Assembly Contact
Post Assembly Contact As Per Drg.no. 8435874 Specn: Drawing No. 8435874 [ Warranty Period: 30 Months After The Date Of Delivery ]
-Post-Assembly-Contact-As-Per-Drg.no.-8435874-Specn:-Drawing-No.-8435874-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>2024-06-12
Korea Republic of Hajang District Waterway Facility Renovation Project Civil Engineering Construction Machinery Construction (cancellation Notice) 2024-06-12
Japan ?road Telemeter Equipment, 1 Set,?constant Traffic Monitoring Equipment, 1 Set,?branch Line Network Monitoring Equipment, 1 Set 2024-06-12
India Repairing Of Cc Road From Judge Rabindranath Samantas House To Raghunath Temple At Anantapur Village In Gangatikuri Gp Under Ketugram-ii P.s. 2024-06-12
India Providing Of Goods Transport Services - Per Mt - Food Grains, Regular Rtc Gurdaspur To Chatha Te 12062024; Open Body Taurus; 16 Ft Truck Qty : 24121 2024-06-12
-Mn-Steel-Horn-Side-Liner-For-Axle-Box-&-Bogie-Frame-Assly.-For-All-Locos.-To-Clw's-Drg.no-05/03/12/190-(item-2)-Alt.5.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>India -Mn-Steel-Horn-Side-Liner-For-Axle-Box-&-Bogie-Frame-Assly.-For-All-Locos.-To-Clw's-Drg.no-05/03/12/190-(item-2)-Alt.5.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>Supply Of Mn Steel Horn Side Liner For Axle Box
Mn Steel Horn Side Liner For Axle Box & Bogie Frame Assly. For All Locos. To Clw's Drg.no 05/03/12/190 (item-2) Alt.5. [ Warranty Period: 30 Months After The Date Of Delivery ]
-Mn-Steel-Horn-Side-Liner-For-Axle-Box-&-Bogie-Frame-Assly.-For-All-Locos.-To-Clw's-Drg.no-05/03/12/190-(item-2)-Alt.5.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>2024-06-12
India Bid For - Annual Maintenance Contract Of Metal Detector Of Ocsl Plant Qty : 1 2024-06-12
Whats app