Filter Search


Asia-Pacific


Location Summary Deadline
India High Mast And Mini Mast Maintenance 2025-08-18
India Bogie Frame Assembly .#* Bogie Frame Assembly For Wag-7 Locomotive To Clw Drg. No. 06/1/12/78 Alt.11, 06/1/12/79 Alt.2 And 06/1/12/49 Alt.11 Conformin g To Rdso Specn. No. Vl. Specn.6 Rev.03 (oct.2015) And Str No. Mp.str.vl-02.02.11 Rev.01 (oct.2015) [ Wa 2025-08-18
-Developmental-Work>India -Developmental-Work>Aic/aed/niet-214/25-26
Developmental Work
-Developmental-Work>2025-08-18
-Installation-Of-Solar-System-Drinking-Water-Reservior-Over-Head-Tank-Infront-Of-Balapur-Ajim-Ali-House-At-Balapur-Sansad-Under-Durgapur-Gp-,-Activity-Id-115073120>India -Installation-Of-Solar-System-Drinking-Water-Reservior-Over-Head-Tank-Infront-Of-Balapur-Ajim-Ali-House-At-Balapur-Sansad-Under-Durgapur-Gp-,-Activity-Id-115073120>04/2025-26/dgp/08
Installation Of Solar System Drinking Water Reservior Over Head Tank Infront Of Balapur Ajim Ali House At Balapur Sansad Under Durgapur Gp , Activity Id-115073120
-Installation-Of-Solar-System-Drinking-Water-Reservior-Over-Head-Tank-Infront-Of-Balapur-Ajim-Ali-House-At-Balapur-Sansad-Under-Durgapur-Gp-,-Activity-Id-115073120>2025-08-18
India Snack Table Knob Assembly .#* Snack Table Knob Assembly To Lgds Drawing No. C&w. Lgd. Sk. No. 1068 Alt. Nil Or Lates t. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-18
India Set Of Items For Stainless Steel. .#* Set Of Items For Stainless Steel Tube Cutter With Cutting Wheels To Cut Stainle ss Steel Tube Of Range - 5 Mm Od To 28 Mm Od Comprising Of: - 1) Tube Cutter Complete Qty- 01 no. 2) Cutting Wheel Of Same Make Qty = 10 2025-08-18
India Axle Box Rear Cover Machined For Vb/ts Coaches, As Per Drawing: medha Drg No. Ca675uv2-135767, Rev-02., Packing Instruction: As Per standard Packing. It Should Be Ensured That Item Should Not Rub during Transportation. The Item Should Be Packed With Adequ 2025-08-18
India Auction Sale Of Property Industrial 250.00 Sqm Auction Property J -53 (f), Property Number- 110450100187, Kishangarh V 2025-08-18
India Construction Of Pucca Water Course In Chak 7 Sgr-c-05 2025-08-18
India Construction Of Community Sanitary Complex - 1 (4 Units) At Bc Welfare Boys Hostel In Rajupalem In Rajupalem Mandal Est. Cost Rs. 12.00 Lakhs 2025-08-18
Whats app