Filter Search


Asia-Pacific


Location Summary Deadline
-Anti-erosion-Work-To-Protect-Village-Berkhedi-Situated-On-The-Bank-Of-Gangro-Rao-River-From-Flood-And-Erosion-In-Tehsil-Behat-District-Saharanpur>India -Anti-erosion-Work-To-Protect-Village-Berkhedi-Situated-On-The-Bank-Of-Gangro-Rao-River-From-Flood-And-Erosion-In-Tehsil-Behat-District-Saharanpur>01/e.e./2025-26 (lot-13)
Anti-erosion Work To Protect Village Berkhedi Situated On The Bank Of Gangro Rao River From Flood And Erosion In Tehsil Behat District Saharanpur
-Anti-erosion-Work-To-Protect-Village-Berkhedi-Situated-On-The-Bank-Of-Gangro-Rao-River-From-Flood-And-Erosion-In-Tehsil-Behat-District-Saharanpur>2025-05-24
-Construction-Work>India -Construction-Work>As Per Nit Work No. 2
Construction Work
-Construction-Work>2025-05-24
-Qty-:-41
>India
-Qty-:-41
>Tender Invited For All In One Pc (v2) (q2)
Qty : 41
-Qty-:-41
>2025-05-24
India Complete Machining And Coating (as Applicable) Of Dabg Items. 2025-05-24
qty:68
>India
qty:68
>Tender Invited For Diode Shtky Barr Rect Smt Hsm190j, Ic Amp Hi Side Prec Curr Sense 8pin 50b, Transistor Mosfet Pchan Smt Si 4485 Dy, Ic Pwm Controller Smt Ucc2807d1, Ic Amp Op Dual Fet Soic 8, Fuse Holder
qty:68
qty:68
>2025-05-24
qty:420
>India
qty:420
>Tender Invited For Oil Preservative Sae-30/px-16
qty:420
qty:420
>2025-05-24
India Inviting Rates For Water Supply Material For The Financial Year 2025-26 2025-05-24
-Supply-Led-Street-Light-Fittings-For-Replacing-Led-Light-(green-City-Mission-Work)-At-Narayan-Roy-Road-And-Other-Different-Areas-In-Ward-No.-126.>India -Supply-Led-Street-Light-Fittings-For-Replacing-Led-Light-(green-City-Mission-Work)-At-Narayan-Roy-Road-And-Other-Different-Areas-In-Ward-No.-126.>Kmc/ee_e/z-vi/126/11/25-26
Supply Led Street Light Fittings For Replacing Led Light (green City Mission Work) At Narayan Roy Road And Other Different Areas In Ward No. 126.
-Supply-Led-Street-Light-Fittings-For-Replacing-Led-Light-(green-City-Mission-Work)-At-Narayan-Roy-Road-And-Other-Different-Areas-In-Ward-No.-126.>2025-05-24
-Annual-O-And-Mtc-Of-Distribution-System-,rising-Main-,sluice-Valves-Including-Operation-Of-Sluice-Valves-At-Bahadurpur-Pwss-Under-Dwsd,phe-Dte-(w.e.f-01.07.2025-To-30.06.2026)>India -Annual-O-And-Mtc-Of-Distribution-System-,rising-Main-,sluice-Valves-Including-Operation-Of-Sluice-Valves-At-Bahadurpur-Pwss-Under-Dwsd,phe-Dte-(w.e.f-01.07.2025-To-30.06.2026)>Annual O And Mtc At Bahadurpur
Annual O And Mtc Of Distribution System ,rising Main ,sluice Valves Including Operation Of Sluice Valves At Bahadurpur Pwss Under Dwsd,phe Dte (w.e.f 01.07.2025 To 30.06.2026)
-Annual-O-And-Mtc-Of-Distribution-System-,rising-Main-,sluice-Valves-Including-Operation-Of-Sluice-Valves-At-Bahadurpur-Pwss-Under-Dwsd,phe-Dte-(w.e.f-01.07.2025-To-30.06.2026)>2025-05-24
India Redevelopment Of Idbi Banks Residential Staff Quarters At Siddharth Nagar, Goregaon(west),mumbai Sh:- Preparation Of 3-d Views And 3-d Animated Walkthrough Of Minimum 2 Minute Duration For This Project 2025-05-24
Whats app