Filter Search


Asia-Pacific


Location Summary Deadline
qty:1
>India
qty:1
>Tender Invited For 3 Part Automated Hematology Analyzer (v2) (q2) ( Pac Only )
qty:1
qty:1
>2025-05-23
qty:10
>India
qty:10
>Tender Invited For Power Contactors As Per Is 13947 - 4 - 1 (q3)
qty:10
qty:10
>2025-05-23
Philippines For Use Of Coastal Protection And Management Project 2025-05-23
India Providing, Installation And Commissioning Of Submersible Pumping Machinery Along With Allied Electro-mechanical Works For Augmentation In Connection To Accommodate Fhtc At P.h. No.-i (new) Under Chandpur W/s Scheme, Zone-i Under Block_ Hasnabad Dis 2025-05-23
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Replacement-Of-Big-Dia.-Tube-Well,-Construction-Of-Pump-House,-Boundary-Wall-Laying-Of-Parallel/-Dedicated-Pipeline-And-Providing-Balance-Fhtc-Of-Birjab>India -Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Replacement-Of-Big-Dia.-Tube-Well,-Construction-Of-Pump-House,-Boundary-Wall-Laying-Of-Parallel/-Dedicated-Pipeline-And-Providing-Balance-Fhtc-Of-Birjab>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 18
Sinking Of 200mm (all Through) Big Dia. Tube Well, Replacement Of Big Dia. Tube Well, Construction Of Pump House, Boundary Wall Laying Of Parallel/ Dedicated Pipeline And Providing Balance Fhtc Of Birjab
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well,-Replacement-Of-Big-Dia.-Tube-Well,-Construction-Of-Pump-House,-Boundary-Wall-Laying-Of-Parallel/-Dedicated-Pipeline-And-Providing-Balance-Fhtc-Of-Birjab>2025-05-23
India Supply of Building Material - Iron Rod ISI TMT (STEEL) 6 MM Rate quated Per KG, Iron Rod ISI TMT (STEEL) 8 MM Rate quated Per KG, Iron Rod ISI TMT (STEEL) 10 MM Rate quated Per KG, Iron Rod ISI TMT (STEEL) 12 MM Rate quated Per KG, Iron Rod ISI TMT (STEEL) 16 MM Rate quated Per KG, "Cement ISI (Maje 2025-05-23
-Reconstruction-Of-Storm-Water-Drain-At-Salai-Road-Vadapaguthi,nedun-Street,theppakula-Theru-In-Ward-No-01>India -Reconstruction-Of-Storm-Water-Drain-At-Salai-Road-Vadapaguthi,nedun-Street,theppakula-Theru-In-Ward-No-01>Reconstruction Of Storm Water Drain At Salai Road Vadapaguthi,nedun Street,theppakula Theru In Ward No01
Reconstruction Of Storm Water Drain At Salai Road Vadapaguthi,nedun Street,theppakula Theru In Ward No 01
-Reconstruction-Of-Storm-Water-Drain-At-Salai-Road-Vadapaguthi,nedun-Street,theppakula-Theru-In-Ward-No-01>2025-05-23
-Engagement-Of-Project-Development-Management-Consultancy-(pdmc)-Unit-At-Tripura-Jal-Board-(urban-Development-Department)-Tripura>India -Engagement-Of-Project-Development-Management-Consultancy-(pdmc)-Unit-At-Tripura-Jal-Board-(urban-Development-Department)-Tripura>Engagement Of Project Development Management Consultancy (pdmc) Unit At Tripura Jal Board (urban Development Department)
Engagement Of Project Development Management Consultancy (pdmc) Unit At Tripura Jal Board (urban Development Department) Tripura
-Engagement-Of-Project-Development-Management-Consultancy-(pdmc)-Unit-At-Tripura-Jal-Board-(urban-Development-Department)-Tripura>2025-05-23
Russian Federation Construction Of A 0.4 Kv Transmission Line From The Existing Support Of The 0.4 Kv Transmission Line No. 207/5 Feeder 2025-05-23
India Maintenance Of 1st Year Road Side Plantation At Chintapalli-kandakur - 3 Km.(including Raising Of 14x20 Seedlings) In Yadgiri Range During 2025-26 2025-05-23
Whats app