Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Rcc Culvert In Annai Velankanni Street, Balaraman Street, Thiruveethiyamman Street, Namalavar Street, Krishna Nagar Pillaiyar Kovil Street, Nandhanar Street, Kattabomman Street Muthamil Nagar, Rangaswamy Street At Ward No.08 2025-12-24
India Tender Invited For Tin Sheet , Cement , Gi Pipe 2 Inch , Gi Pipe 1 5inch , Grill , Solid Bricks , Cpvc Pipe 1 Inch , Labour Charge , Installation Charge##quantity: 234## 2025-12-24
India Construction Of Anganawadi Center In Bananthahalli Village Y.t Halli G.p, Channapatna Taluk.(mgnrega Convergence Work) Construction Of Anganawadi Center In Bananthahalli Village Y.t Halli G.p, Channapatna Taluk.(mgnrega Convergence Work) 2025-12-24
-Operation-And-Guarding-Of-Pumping-Machinery-(automatic-Operation)-Including-All-Allied-Electro-mechanical-Components-Installed-At-Different-Ws-Scheme-In-The-District-Of-Malda-Under-Mlmd,-Phe-Dte.>India -Operation-And-Guarding-Of-Pumping-Machinery-(automatic-Operation)-Including-All-Allied-Electro-mechanical-Components-Installed-At-Different-Ws-Scheme-In-The-District-Of-Malda-Under-Mlmd,-Phe-Dte.>Wbphed/ee/mlmd/niet_16 Of 2025-2026
Operation And Guarding Of Pumping Machinery (automatic Operation) Including All Allied Electro-mechanical Components Installed At Different Ws Scheme In The District Of Malda Under Mlmd, Phe Dte.
-Operation-And-Guarding-Of-Pumping-Machinery-(automatic-Operation)-Including-All-Allied-Electro-mechanical-Components-Installed-At-Different-Ws-Scheme-In-The-District-Of-Malda-Under-Mlmd,-Phe-Dte.>2025-12-24
India Karimkunnam Gp 25 26 Pr 171 Renovation Of Mattathippara Thudanganad Road 2025-12-24
India Construction Of A Mahadalit Community Building And Workshop In Village Radhopur Dakshini (police Station No. 08, Account No. 3640, Khasra No. 10001), Manigachhi Block, Darbhanga District. 2025-12-24
India Tender Invited For Autonomic Function Tests##quantity: 1## 2025-12-24
India Maintenance Operation Electrical Installation And Fans I/c Pump Set, Street Light In Phase I, Sector Vii, Antop Hill, Mumbai 37. Sh- Rectification And Prevention Of Water Ingress And Changing Of Damaged Worn Out Lead Wire In Electrical Meter Cabins At Pha 2025-12-24
India Construction Of Concrete Pathway Of Size (2.50m X 550m) Besides The Pit Line No.1 towards Main Line At Coach Care Centre Madgaon In Goa State 2025-12-24
India Construction Of Retaining Wall At Karli River Near Bibwane Kandechi Gaalvi Survey No 31 Usha Dinanath Dhuri Tal Kudal Dist Sindhudurg 2025-12-24
Whats app