Filter Search


Asia-Pacific


Location Summary Deadline
India Site Survey, Designing, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery At Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation Of All Items/material Required To Complete Works For 2025-12-29
-Installation-Of-High-Mast-Solar-Light-Beside-Nil-Ratan-Dutta-House-At-Boroi-Madhyapara-(apas/01/045/28/0002)>India -Installation-Of-High-Mast-Solar-Light-Beside-Nil-Ratan-Dutta-House-At-Boroi-Madhyapara-(apas/01/045/28/0002)>E34h1db202526_sl_2(apas)
Installation Of High Mast Solar Light Beside Nil Ratan Dutta House At Boroi Madhyapara (apas/01/045/28/0002)
-Installation-Of-High-Mast-Solar-Light-Beside-Nil-Ratan-Dutta-House-At-Boroi-Madhyapara-(apas/01/045/28/0002)>2025-12-29
India Request For Proposal For Selection Of Agency To Provide Driver, Conductor And Workshop Services For Daily Operations In Pune Mahanagar Parivahan Mahamandal Limited 2025-12-29
India Tender Invited For All In One Pc (v2) (q2)##quantity: 15## 2025-12-29
India Oil Flow Indicator Kit Suitable .#* Oil Flow Indicator Kit Suitable For Traction Transformer Of Vande Bharat Coaches As Per Annex ure-a Enclosed. Make:- Jsti Only. The Item Shall Be Procured From Oem Or Its Authorized Dealers Only. Deale rship Certificate 2025-12-29
India Tender Invited For Ballast Pocket Assy-i As Per Drawing No- 27193106000 Rev 02 (item Sl No- 001 To 009) , Ballast Pocket Assy-ii As Per Drawing No- 27193106001 Rev 02 ( Item Sl No- 001 To 008) , Ballast Pocket Assy-iii As Per Drawing No- 27193106002 Rev 0 2025-12-29
India Tender Invited For Repairing Of 02nos Crusher Rolls Of Secondary Crusher Bearing Opening And Fitting Bearing Block Fitting Of Ir Chp Of Gondegaon Ocm .#* Repair, Maintenance And Installation Of Plant/ Systems/equipments##quantity: 1## 2025-12-29
India Construction Work Of Gate And Rcc Drain In Kabeer Ward Mokshdham 2025-12-29
-Improvement-To-Left-Service-Bank-From-Rd-22.20km-To-23.80km-And-Construction-Of-Both-Side-C.c.-R>India -Improvement-To-Left-Service-Bank-From-Rd-22.20km-To-23.80km-And-Construction-Of-Both-Side-C.c.-R>Improvement To Left Service Bank From Rd 22.20km To 23.80km And Construction Of Both Side C.c. Road From Rd 24.073km To 24.50km Of Charampa Branch Canal
Improvement To Left Service Bank From Rd 22.20km To 23.80km And Construction Of Both Side C.c. R
-Improvement-To-Left-Service-Bank-From-Rd-22.20km-To-23.80km-And-Construction-Of-Both-Side-C.c.-R>2025-12-29
India Construction Of Pcc Road From Galundi Anath Bandhu Sant House To Ashok Dom House 2025-12-29
Whats app