Filter Search


Asia-Pacific


Location Summary Deadline
-Restoration-And-Repairing-Of-Drain-Along-With-Drain-At-B.m.-Road-Bye-Lane-Starting-From-Ho-Naresh-Dundun-To-Gaitry-Devi-In-Ward-No-04,-Booth-No-83,-Sl-No-01-Within-Champdany-Municipality.>India -Restoration-And-Repairing-Of-Drain-Along-With-Drain-At-B.m.-Road-Bye-Lane-Starting-From-Ho-Naresh-Dundun-To-Gaitry-Devi-In-Ward-No-04,-Booth-No-83,-Sl-No-01-Within-Champdany-Municipality.>Restoration And Repairing Of Drain
Restoration And Repairing Of Drain Along With Drain At B.m. Road Bye Lane Starting From Ho Naresh Dundun To Gaitry Devi In Ward No 04, Booth No 83, Sl No 01 Within Champdany Municipality.
-Restoration-And-Repairing-Of-Drain-Along-With-Drain-At-B.m.-Road-Bye-Lane-Starting-From-Ho-Naresh-Dundun-To-Gaitry-Devi-In-Ward-No-04,-Booth-No-83,-Sl-No-01-Within-Champdany-Municipality.>2025-12-31
-Construction-Of-New-Drain-At-East-Nityananda-Nagar-Beside-Unnayan-Samity-,-Ward-No.--45,under-Hmc-,apas-Fund-Defect-Liability-Period-01-Year.>India -Construction-Of-New-Drain-At-East-Nityananda-Nagar-Beside-Unnayan-Samity-,-Ward-No.--45,under-Hmc-,apas-Fund-Defect-Liability-Period-01-Year.>Wb-hmc/tn/ed/sandd/28/25-26_23
Construction Of New Drain At East Nityananda Nagar Beside Unnayan Samity , Ward No.- 45,under Hmc ,apas Fund Defect Liability Period 01 Year.
-Construction-Of-New-Drain-At-East-Nityananda-Nagar-Beside-Unnayan-Samity-,-Ward-No.--45,under-Hmc-,apas-Fund-Defect-Liability-Period-01-Year.>2025-12-31
-Construction-Of-Irrigation-Field-Channel-i,-(188-Rmt)-At-Bankati-Mouza-bankati,-J.l.-No.-38,-On-Plot-No-517,-G.p--Junbedia,-Block--B>India -Construction-Of-Irrigation-Field-Channel-i,-(188-Rmt)-At-Bankati-Mouza-bankati,-J.l.-No.-38,-On-Plot-No-517,-G.p--Junbedia,-Block--B>Excavation Of Whs In Situ Moisture Content Dugwell, Lds And Irigation Channelat Different Places Of Bankura District
Construction Of Irrigation Field Channel-i, (188 Rmt) At Bankati Mouza-bankati, J.l. No.-38, On Plot No-517, G.p- Junbedia, Block- B
-Construction-Of-Irrigation-Field-Channel-i,-(188-Rmt)-At-Bankati-Mouza-bankati,-J.l.-No.-38,-On-Plot-No-517,-G.p--Junbedia,-Block--B>2025-12-31
India Construction Of Concrete Road With Cement Concrete From Suman Malick House To Tube Well At Telua 2025-12-31
-Repairing-Of-Road-At-Anandapally-From-Rakkhakor-Chatterjee-House-To-Godadhor-Pal-House(apas/01/260/196/0003)>India -Repairing-Of-Road-At-Anandapally-From-Rakkhakor-Chatterjee-House-To-Godadhor-Pal-House(apas/01/260/196/0003)>Wbmad/apas/10/196/2025-26/sl2
Repairing Of Road At Anandapally From Rakkhakor Chatterjee House To Godadhor Pal House(apas/01/260/196/0003)
-Repairing-Of-Road-At-Anandapally-From-Rakkhakor-Chatterjee-House-To-Godadhor-Pal-House(apas/01/260/196/0003)>2025-12-31
India Construction Of Pcc Road From Durga Mandir Towards Dulal Mondal House, Mouza- Amua, Jl-12, Plot-1101/1607 2025-12-31
India Installation Of Tube Well Beside Manoranjans House 2025-12-31
India Installation Of New Rigbone Tube Well Near The Axiom School At Looksan Gp 2025-12-31
-Overall-Upgradation-Of-Dakshin-Nangla-Gsfp-School-(roof,-Toilet,-Painting-Etc.)>India -Overall-Upgradation-Of-Dakshin-Nangla-Gsfp-School-(roof,-Toilet,-Painting-Etc.)>Repairing Of Cc Road, Drain Etc.
Overall Upgradation Of Dakshin Nangla Gsfp School (roof, Toilet, Painting Etc.)
-Overall-Upgradation-Of-Dakshin-Nangla-Gsfp-School-(roof,-Toilet,-Painting-Etc.)>2025-12-31
India Ral-7024 Base Colour Graphite Grey Pu Paint Etc. .#* Ral-7024 Base Colour Graphite Grey Pu Paint [material Should Be In 5 Liters. containers]. Paint Shall Be Confirming To Rdso Specn. No. M&c/pcn/100 /2018 And Rdso Am endment No. 1b (rev-2.0) As An Additi 2025-12-31
Whats app