Filter Search


Asia-Pacific


Location Summary Deadline
India Improvements To Giribettadakere Draft Valley From Ch 0.00 Km To 2.600km And Ch 6.10km To 9.80 Km (tail End Kabini River) For Avoiding Scouring Of Atchkat Land In Hosahalli And Siddaramanahundi Village Of Mysuru Taluk And District. 2025-09-18
India S/i/t/c Of Fixed And Ptz Cctv Cameras At Karur Terminal 2025-09-18
India Hiring Vehicle For Office Work On Monthly And Call Basis As Per Tender 2025-09-18
Vietnam Renewal Of Pipes For Knt-p5 Knt Wells (36-vt-2593/25-kt) 2025-09-18
India Annual Plan-ibp-annual Plan 2025-26 71/26construction Of Side Wall In Doctor Raman Kutty Nagar Polachira 12 Ward-71/26-general Civil Work 2025-09-18
India Drilling Of 16 Inch Dia 01 No Non Coring Pumping Bore Hole Along Plus 1l 21d From Surface To Rvi Seam At Mic Jpc 2025-09-18
Singapore Supply And Commissioning Of Closed Cycle Optical Cryostat System 2025-09-18
India Repairs To Existing Gym Equipment At I) Manoju Chervu Park In 5th Ward Ii)lic Park In 14th Ward ,iii) Kothapeta Park In27th Ward Peddapuram Municipality. (under Municipal General Funds) 3rd Call 2025-09-18
India Condition Monitoring And Maintenance Of Dg Sets Over Solapur Division For The period Of Three Years.(re-invitation). 2025-09-18
India Design, Engineering, Procurement Of Material, Manufacture, Fabrication, Shop Testing, Packaging, Loading, Supply To Site, Shifting Of Materials From Store To The Erection Site , Erection, Site Testing, Commissioning, Regular Operation And Maintenance Of C 2025-09-18
Whats app