Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Pcc Road From Hazrapara Pcc Road Towards Suban Soren Hambhu Sarkar House At Ahira Village Of Satgachia-i Gp Within Memari-ii Ps. 2025-12-30
-Annual-Maintenance-Of-Water-Supply-Pipe-Line-Irrespective-Of-Dia.-Including-Reparing-Leakage-And-Replacement-Of-Pipe-Line-With-Providing-Valves-When-And-Where-Requires-And-Also-Reparing-Of-Air-Valves-And-To-Remove-Contaminat>India -Annual-Maintenance-Of-Water-Supply-Pipe-Line-Irrespective-Of-Dia.-Including-Reparing-Leakage-And-Replacement-Of-Pipe-Line-With-Providing-Valves-When-And-Where-Requires-And-Also-Reparing-Of-Air-Valves-And-To-Remove-Contaminat>Wb-hmc/tn/ed/ws/10/25-26
Annual Maintenance Of Water Supply Pipe Line Irrespective Of Dia. Including Reparing Leakage And Replacement Of Pipe Line With Providing Valves When And Where Requires And Also Reparing Of Air Valves And To Remove Contaminat
-Annual-Maintenance-Of-Water-Supply-Pipe-Line-Irrespective-Of-Dia.-Including-Reparing-Leakage-And-Replacement-Of-Pipe-Line-With-Providing-Valves-When-And-Where-Requires-And-Also-Reparing-Of-Air-Valves-And-To-Remove-Contaminat>2025-12-30
India Digital Wheel Diameter Measuring Gauge. .#* Digital Wheel Diameter Measuring Gauge As Per Attached Technical Specification With Tender. [ Warranty Period: 12 Months After The Date Of Delivery ] ] 2025-12-30
India Laying Of Cc Road In Place Of Damaged Cc Road From (i) 1-2-342/3 To 1-2-343/6, Gangaputra Sangam, Phoolbagh, (ii) 1-2-365/6 To 1-2-365/15, Phoolbagh-2 (iii) 1-2 48/1/93 To 1-2-48/8, Deviprasad Bagh Iv) New Ambedkar Nagar 1-2-607/23/1/50 To Motul In Kavadi 2025-12-30
India 17. W No 20 Moh Sarai Peerzadganj Mein Akhtar Pradhan Ke Makan Se Shameem Ke Makan Tak Branch Gali Sahit Cc Sadak Nali Nirman 2025-12-30
India Civil Work 2 2025-12-30
India Road Repairing From Mantu Mandal House To Mithun Mandal House At Sahebramtola Approx 70 Miter. Scheme Idapas/01/049/39/0002 2025-12-30
-Constriction-Of-Boundary-Wall-At-80-No-Icds-Center-And-Repairing-Road-Bagdanga-Bhoirov-Tala-Ground-To-Icds-Centerat-Bagdanga-Chhinamore-Gp-Under-Singur-Dev-Block.>India -Constriction-Of-Boundary-Wall-At-80-No-Icds-Center-And-Repairing-Road-Bagdanga-Bhoirov-Tala-Ground-To-Icds-Centerat-Bagdanga-Chhinamore-Gp-Under-Singur-Dev-Block.>4504/bdosingur Sl No 3
Constriction Of Boundary Wall At 80 No Icds Center And Repairing Road Bagdanga Bhoirov Tala Ground To Icds Centerat Bagdanga Chhinamore Gp Under Singur Dev Block.
-Constriction-Of-Boundary-Wall-At-80-No-Icds-Center-And-Repairing-Road-Bagdanga-Bhoirov-Tala-Ground-To-Icds-Centerat-Bagdanga-Chhinamore-Gp-Under-Singur-Dev-Block.>2025-12-30
India Operation And Maintenance And Transfer Of Community Toilets And Urinals Including All T And P, Replacement Of Damage Items And Other Maintenance Work In Public Heath-ii Custer C Area, For 5 Year On Non Digital Advertisement Basis Noida 2025-12-30
-Construction-Of-Boundary-Wall>India -Construction-Of-Boundary-Wall>Construction Of Boundary Wall At Gphd Subdivision, Sunabeda-1 In The District Of Koraput During 2025-26
Construction Of Boundary Wall
-Construction-Of-Boundary-Wall>2025-12-30
Whats app