Filter Search


Asia-Pacific


Location Summary Deadline
India Advancing Term Loan From Intending Financial Institution To Meet Expenditure For The Project Augmentation Of Existing Transformer By Higher Capacity 2025-08-21
India In Ward No. 4, Pvc Pipeline From Ambedkar Bhavan To Budagappa House And The Road Leading From Budagappa House To The Public Toilet Will Be Laid By Breaking Up The Concrete On The Side Roads, Installing The Pipeline And Covering It With Concrete. (90m) (mp 2025-08-21
India Comprehensive Repair To Structural Deterioration Leakage/seepage And Structural Strengthning Of Water Retaining Structural And Other Rcc Structural At Mil Stn Under Age (i) Udaipur 2025-08-21
India Road Construction Work Near The House Of Ramesh Chand Joshi, House No. 831, Hanuman Vihar, Call Nagar, Ward 01b. (mla Fund) 2025-08-21
-Prov.-House-Conne>India -Prov.-House-Conne>Providing Improved Access To Water Through Household Connection In Various Existing Water Supply Schemes Block Majitha Distt. Amritsar Under Jjm-nwqsm- Nabard Xxvi Section 14 Part Of Surface Water Project Gaunsal Afgana -kandowali.
Prov. House Conne
-Prov.-House-Conne>2025-08-21
India Construction Of Single Lane Bt To Cc (white Topping) Road At Industrial Estate, Sriganganagar 2025-26 2025-08-21
-Urgent-Supply,-Delivery-And-Fitting-Fixing-Including-Necessary-Testing-Of-150/100/5/5(amp)-Ct-With-Allied-Works-For-Spare-800-Amp-Ht-Vcb-Panel-For-The-Ongoing-Newly-Installed-Pump-Unit-No.-3-At-Swf-Station-Of-Pbps(drg.)/s>India -Urgent-Supply,-Delivery-And-Fitting-Fixing-Including-Necessary-Testing-Of-150/100/5/5(amp)-Ct-With-Allied-Works-For-Spare-800-Amp-Ht-Vcb-Panel-For-The-Ongoing-Newly-Installed-Pump-Unit-No.-3-At-Swf-Station-Of-Pbps(drg.)/s>Kmc/dr/pbps/e/02/2025-2026
Urgent Supply, Delivery And Fitting Fixing Including Necessary Testing Of 150/100/5/5(amp) Ct With Allied Works For Spare 800 Amp Ht Vcb Panel For The Ongoing Newly Installed Pump Unit No. 3 At Swf Station Of Pbps(drg.)/s
-Urgent-Supply,-Delivery-And-Fitting-Fixing-Including-Necessary-Testing-Of-150/100/5/5(amp)-Ct-With-Allied-Works-For-Spare-800-Amp-Ht-Vcb-Panel-For-The-Ongoing-Newly-Installed-Pump-Unit-No.-3-At-Swf-Station-Of-Pbps(drg.)/s>2025-08-21
India Providing And Fixing Of Air Conditioners And Other Electric Items At Siam Auditorium Jaipur, 2.0, Supply , Installation, Testing And Comissioning Of Inverter Type Air Cooled Hi Wall Split Type Air Conditioners With Latest Star Rating System As Per Bee Am 2025-08-21
India Tender Invited For Mobile Industrial Lubricants Make Vacoline 133 Oil.##quantity: 208## 2025-08-21
India Ring Tongue Copper Crimping Socket For E Beam Cable Size Of 1.5 Sq.mm .#* Ring Tongue Copper Crimping Socket For E Beam Cable Size Of 1.5 Sq.mm As Per Item No.11 of Rcf Specification No.edts-201,rev-a, Am-3, Corr-2. [ Warranty Period: 30 Months After The 2025-08-21
Whats app