Filter Search


Asia-Pacific


Location Summary Deadline
India Pri, Year - ,2.0 ,earth Work In Bulk Excavation By Manual Means Over Areas (exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 M2 On Plan) Including Disposal Of Excavated Earthlead Upto 50 Meters And Lift Upto 1.5 M, As Directed By Engineer-in-charge. 2025-08-20
India Handling Of Food Grain ,2.0 ,for Loading And Unloading Of Paddy Consignment From Centre To Godowns. ,as Per Fci Cost Sheet (bsor/sor) ,brick Work In C.m 1:5 Mix Using 2nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All 2025-08-20
India Drilling Borewell And Install Motor Pump And Connection Electric Supply To Ashraya Colony At Ward No 01 2025-08-20
India Bush For Gear Case Lug For Hitachi Magnet Frame .#* Bush For Gear Case Lug For Hitachi Magnet Frame (plw Existing Pl No. 25378790) As Per drg.no. 4twd.095-079 Specn: Forged Steel Bar To Is 200491 Class-4 [ Warranty Period: 30 Months After T he Date Of Del 2025-08-20
-Boq>India -Boq>Renovation Of Chain Link Fencing Of Colusers Under Campa 2025 26
Boq
-Boq>2025-08-20
India Supply Of Keypad For Ultrasonic Bath (sonicator) ,2.0 ,supply Of ,keypad For Ultrasonic Bath (sonicator) 2025-08-20
India Diaphragm For Pneuphonic Horn .#* Diaphragm For Pneuphonic Horn As Per Drg.no.elw/bsl/4/f-74.104 Alt-1. The Mat erial To Be Procured From Clw Approved Sources Only Vendor Directory Attached. [ Warranty Period: 3 0 Months After The Date Of Delivery ] ] 2025-08-20
India Sale Of Property By The Cosmos Co-op. Bank Ltd, Vadodara V/s. M/s Dinesh Pharmaceutical Pvt. Ltd 2025-08-20
-Operation-And-Maintenance-Of-Iron-Elimination-Plant-At-Matiagacha-W/s-Scheme-Under-Bongaon-Sub-division,-P.h.e.-Dte.-(for-365-Days)>India -Operation-And-Maintenance-Of-Iron-Elimination-Plant-At-Matiagacha-W/s-Scheme-Under-Bongaon-Sub-division,-P.h.e.-Dte.-(for-365-Days)>Iep At Matiagacha Pwss
Operation And Maintenance Of Iron Elimination Plant At Matiagacha W/s Scheme Under Bongaon Sub-division, P.h.e. Dte. (for 365 Days)
-Operation-And-Maintenance-Of-Iron-Elimination-Plant-At-Matiagacha-W/s-Scheme-Under-Bongaon-Sub-division,-P.h.e.-Dte.-(for-365-Days)>2025-08-20
India Skscm/cane Trans (nainiha 2nd)/2025-26 2025-08-20
Whats app