Filter Search


Asia-Pacific


Location Summary Deadline
India Work No 2 Design Drawing Estimation Monitoring Of The Project Mini Stadium At Khasara 689 Gram Kirra Khurja Bulandshahr Area 3000 Sqm 2026-01-05
India Supply Of Stationary Items, Paper, 6 Inches Steel Knife (4c Palam) Lifebuoy Hand Wash (sit. Jerrycan)harpic (1 Litre Bottle)drinking Glass (glass)stamp Pad Ink (corex)lock Small (50 Mm)lock Palam (65 Mm)navtal Lock (godrej) (65 Mm)eraser (doms)stapler Mac 2026-01-05
India Corona Resistant Round .#* Corona Resistant Round Enameled Winding Wire As Per Rdsos Specification No.rdso/2 014/el/spec/0116 [ Revision 0] Size 18 Swg.(1.21 Mm) Grade-2, Specn. Rdsos Specification No.rdso/201 4/el/spec/0116 [ Revision 0] [ Warranty Perio 2026-01-05
India Tender Invited For Manpower Outsourcing Services - Minimum Wage - Skilled; High School; Others##quantity: 4## 2026-01-05
India Arrangement Of Chain. .#* Arrangement Of Chain And Mug In The Lavatory For Ac And Non Ac Coaches T o Sr.sk.no.c&w-4163/bg, Alt. 4. Supply Condition:- To Be Supplied In Assembled Condition. [ warranty Period: 30 Months After The Date Of Delivery ] [quantit 2026-01-05
Indonesia Procurement Of The Gorontalo Clubhouse 2026-01-05
-Removal-Of-Insulcoat-Paint-From-The-Foot-Insulators-Of-Pantograph,-Surge-Arrester-And-Vcb-Of-Rs-1/rs-4/r>India -Removal-Of-Insulcoat-Paint-From-The-Foot-Insulators-Of-Pantograph,-Surge-Arrester-And-Vcb-Of-Rs-1/rs-4/r>Removal Of Insulcoat Paint From The Foot Insulators Of Pantograph, Surge Arrester And Vcb Of Rs-1/rs-4/rs-6 Cars Of Trains At Shastri Park Depot
Removal Of Insulcoat Paint From The Foot Insulators Of Pantograph, Surge Arrester And Vcb Of Rs-1/rs-4/r
-Removal-Of-Insulcoat-Paint-From-The-Foot-Insulators-Of-Pantograph,-Surge-Arrester-And-Vcb-Of-Rs-1/rs-4/r>2026-01-05
India Tender Invited For High End Desktop Computer (q2)##quantity: 230## 2026-01-05
-Operation-And-Maintenance-Of-Under-Ground-Sewarage-System-Completed-Area-In-The-Package-I-And-Ii-For-The-Period-Of-2.5-Months-From-16th-January-2026-In-Erode-City-Municipal-Corporation.>India -Operation-And-Maintenance-Of-Under-Ground-Sewarage-System-Completed-Area-In-The-Package-I-And-Ii-For-The-Period-Of-2.5-Months-From-16th-January-2026-In-Erode-City-Municipal-Corporation.>E1-7694-2025-erode City Municipal Corporation
Operation And Maintenance Of Under Ground Sewarage System Completed Area In The Package I And Ii For The Period Of 2.5 Months From 16th January 2026 In Erode City Municipal Corporation.
-Operation-And-Maintenance-Of-Under-Ground-Sewarage-System-Completed-Area-In-The-Package-I-And-Ii-For-The-Period-Of-2.5-Months-From-16th-January-2026-In-Erode-City-Municipal-Corporation.>2026-01-05
-Construction-Of-10-Kld-Fstp-At-Padaveedu-Town-Panchayat,-Namakkal-District.>India -Construction-Of-10-Kld-Fstp-At-Padaveedu-Town-Panchayat,-Namakkal-District.>Retender - Sbm U 2.0 2025-2026
Construction Of 10 Kld Fstp At Padaveedu Town Panchayat, Namakkal District.
-Construction-Of-10-Kld-Fstp-At-Padaveedu-Town-Panchayat,-Namakkal-District.>2026-01-05
Whats app