Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of Pin Insulator 11kv Composite Polymeric For The Use Of Various Electrical Section Under Electrical Division. 2025-08-18
India Construction Of Community Sanitary Complex Near Panchayat Ghar Sonamarg-b Block Gund ,2.0 ,earthwork In Bulk Excavation By Mechanical Means In Trenches For Foundations, Drains, Pipes,cables Etc (not Exceeding 1.5m In Width) And For Shafts, Wells, Cesspits 2025-08-18
India Contractors For Electrical And Ac Works Of Proposed New Branch At Padinharethara, Calicut Region. 2025-08-18
India Repairing And Maintenance Of Qtr. No. At Ekc Under Nakc Govindpur Area ,2.0 ,civil Work ,distempering With 1st Quality Acrylic Distember (ready Mix) Having Voc Content Less Than 50 Grams/ Litre Of Approved Brand And Manufacture To Give An Even Shade : O 2025-08-18
India Support For Smgr To Ms. Adtranz .#* Support For Smgr To Ms. Adtranz Pt. No. A-1911 Drg. No. Swt-235137-p1 Or Ms. aal Pt. No. M-1911 With 02 Nos. Keys Pt. No. A-1916 Drg. No. Am-500224-p1 Or Ms. Aal Pt. No. M-19 16, Comprising 02 Items -03 Nos. Nos. [ Warr 2025-08-18
India Providing Repairs To Walkways Along Nuzvid Road From Pipul Road Junction To Kandrika Junction In Ae-13 Section 2025-08-18
India Coupling Flange Complete As Per Repl Par [coupling Flange Complete As Per Repl part No. A1926.1 Or Aecpl Part No. M1926.1 For N-32 Tap Changer.] .#* Coupling Flange Complete As Per Repl Part No. A1926.1 Or Aecpl Part No. M1926.1 For N-32 tap Changer. [ Wa 2025-08-18
India Renovation Work Of Indo-nepal Border Road Saraigarh (gardhiya Chowk) To Refugee Colony In Km 32.65 To 46.035 (total Length-13.385 Km) For The Year 2025-26 Under Road Division, Supaul. 2025-08-18
India Set Of Hex Head Bolt (ht) With Nut, Spring And Flat Washer. .#* Set Of Hex Head Bolt (ht) With Nut, Spring And Flat Washer. 1). Bolt Size- 12x90mm (02 Nos.) , Nut Size 12mm (02 Nos), Spring Washer-12mm (02 Nos), Flat Washer-12mm (02 Nos. Grade-10.9 Is-136 2025-08-18
-Comprehensive-Student-Insurance-Policy-For-The-Students-Admitted-During-2025-26-For-Their-Entire-Tenure-Of-The-Study-On-A-Long-Term-Basis.>India -Comprehensive-Student-Insurance-Policy-For-The-Students-Admitted-During-2025-26-For-Their-Entire-Tenure-Of-The-Study-On-A-Long-Term-Basis.>Student Insurance Policy For The Students Admitted During 2025-26
Comprehensive Student Insurance Policy For The Students Admitted During 2025-26 For Their Entire Tenure Of The Study On A Long Term Basis.
-Comprehensive-Student-Insurance-Policy-For-The-Students-Admitted-During-2025-26-For-Their-Entire-Tenure-Of-The-Study-On-A-Long-Term-Basis.>2025-08-18
Whats app