Filter Search


Asia-Pacific


Location Summary Deadline
India General-pro No.-/- Re Tarring Work At Adivaram Karimkutti Road-ward No.amound - /--general Civil Work ,2.0 ,road ,3.5.2:excavation In Soil With Dozer With Lead Upto 100 M Excavation For Roadway In Soil By Mechanical Means Including Cutting And Pushing Th 2025-08-21
India General-pro No./-re Tarring Work At Pathekkra Karingalode Road-ward No.amount-/--general Civil Work ,2.0 ,road ,3.5.2:excavation In Soil With Dozer With Lead Upto 100 M Excavation For Roadway In Soil By Mechanical Means Including Cutting And Pushing The 2025-08-21
India Annual Plan-annual Plan -.vazhikkilichira Parakka Road Maintenance Ward - ( Proj.no./)-vazhikkilichira Parakka Road Maintenance .ward - ( Proj.no./)-general Civil Work ,2.0 ,retarring ,75.5.5.b.2pb:modified Penetration Macadam 75 Mm Thick Using Bitumen S- 2025-08-21
India Upgradation Of 112 D-i Flats & 104 Garages At Rabindra Nagar, New Delhi Dg. 2025-26. Sh- Upgradation Work And Other Miscellaneous Works In Flat No. D1-25 And Other Flats Of Rabindra Nagar .#* Civil Work 2025-08-21
India Annual Plan-malappuram Thottathilpadi Road Naveekaranam Ward /vallapuzha Gp/pro No:/mgr-/---general Civil Work ,2.0 ,cc Pavement ,3.2:preparation Of Foundation For Embankment Scarifying Existing Bituminous Surface To A Depth Of 150 Mm By Mechanical Means 2025-08-21
India Construction Of Bridge Near Yahyakhan Compund On Pwd Road At Kinner Panchayat In Karwar Taluka. 2025-08-21
India Supply & Erection Of Illumination For Dasara-2025 For Various Roads Of Kadakola Section, Nr Mohalla Division 2025-08-21
Philippines Lactation Mngt Session Batch 2 2025-08-21
-Repairing-And-Overhauling-Work-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-65.43-Cum-Per-Hour-And-Of-Blower-Room-And-Allied-Works-Of-Sankail-Piped-Water-Supply-Scheme-At-Habibpur-Dev.-Block-U>India -Repairing-And-Overhauling-Work-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-65.43-Cum-Per-Hour-And-Of-Blower-Room-And-Allied-Works-Of-Sankail-Piped-Water-Supply-Scheme-At-Habibpur-Dev.-Block-U>Wbphed/ee/md/niet_28 Of 2025-2026, Sl.no.19
Repairing And Overhauling Work Of Iron Elimination Plant (pressure Type) Having Capacity 65.43 Cum Per Hour And Of Blower Room And Allied Works Of Sankail Piped Water Supply Scheme At Habibpur Dev. Block U
-Repairing-And-Overhauling-Work-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-65.43-Cum-Per-Hour-And-Of-Blower-Room-And-Allied-Works-Of-Sankail-Piped-Water-Supply-Scheme-At-Habibpur-Dev.-Block-U>2025-08-21
India Sale Of Property By Yes Bank Limited, Surat V/s. M/s Zevar Ornaments Private Limited (shop No.4) 2025-08-21
Whats app