Filter Search


Asia-Pacific


Location Summary Deadline
India Set Of Rotor Stamping Of Three Phase .#* Set Of Rotor Stamping Of Three Phase Tm Type 6fra6068 (i) Rotor Main Stamping. Drawing No. 1t wd.096.010 Alt-10 Ref-1 Or Latest. Spec No. 4tms.096.053 Rev-2 Alt-11 Or Latest. Qty- 924/set (ii) Rotor Mid Sta mping. 2025-06-23
India Hex Head Screw-is:1364/2002 .#* Hex Head Screw-is:1364/2002 (pt-2)/iso 4017-m16x40mm-p.c.-8.8 -zinc Plated.from rdso/clw/cee Approved Sources Only Manufacturers Name And Property Class Must Be Em bossed/indented On Hardwares. [ Warranty Period: 30 Months 2025-06-23
India Complete Pantograph Assembly For 3 Phase Emu / Memu, With All Accessories .#* Complete Pantograph Assembly For 3 Phase Emu / Memu, With All Accessories As Per Ftrtipl part No. Ft0054008-109 And Ftrtipl Model No. Lx2600, Make: Faiveley Transport Rail Techn 2025-06-23
India Roller Bearing Nu 311ecj Of Driving End (de) .#* Roller Bearing Nu 311ecj Of Driving End (de) (size 120x55x29mm) Suitable For 4.5 Kw A ternator Of Railway Coaches Make Skf/fag/nsk (imported) [ Warranty Period: 30 Months After The D ate Of Delivery ] [quan 2025-06-23
India Spare Items For Air Brake System .#* Spare Items For Air Brake System In Lhb Coaches, Item- Emergency Exhaust Valve, Ftil Part no. Ft0051128-100, Make- Ftil. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-23
India Spring Exhaust Valve .#* Spring Exhaust Valve Specification: Blw Pt No: 16160034, Blw Drg No: 8068791 Alt - kf & Blw Specification Misc-536, Rev- R1 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-23
India Prepiercing Mandrel Above 11 .#* Pre Piercing Mandrel Above 11 (drg. No.- 15806690) For Wheel Blanking Press Type Srp- r-9000 Of Fwp. Material Grade: 55nicrmov7 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-23
India Spare Items For Air Brake System In Lhb .#* Spare Items For Air Brake System In Lhb Coaches, Item- Stainer- Fp Filter, Ftil Part No. 00900 7000, Make- Ftil. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-23
India Under Frame Assembly .#* Under Frame Assembly Complete,fabricated With Floor Ventilation Ductings,bracket Assemblies For Inv erted Under Frame And Body Side&floor Secondary Members For Wag9hc Type Locomotives As Per Drg.no. 291705 03 Alt-nil Specn: Clw/ms 2025-06-23
India Eot Crane 20 Ton .#* Cost Of Concomitant Accessories According To Tender Specification. [ Warranty Period: 30 M onths After The Date Of Delivery ] ] 2025-06-23
Whats app