Filter Search


Asia-Pacific


Location Summary Deadline
India Deployment Of Fire Persons In Round The Clock Duty At Fire Fighting Div. Under S.e. (tmd-iii), 1x500 Mw, Htps. 2025-12-24
India Cluster -02 Wvm Units At Orai Station 1. At Pf No.01 Between Pillar No. 1241/26 & 1241/24 , Cnb End. 2. At Pf No.01 Between Pillar No. 1241/20 & 1241/21 , Jhs End. 2025-12-24
-Leasing-Of-3.9-Tons-Parcel-Space-In-Fslr-Coach-(single-Compartment)-Of-Train-No.-22626-(ex.-Sbc-To-Mas)-
-Leasing-Of-3.9-Tons-Parcel-Space-In>India
-Leasing-Of-3.9-Tons-Parcel-Space-In-Fslr-Coach-(single-Compartment)-Of-Train-No.-22626-(ex.-Sbc-To-Mas)-
-Leasing-Of-3.9-Tons-Parcel-Space-In>Leasing Of 3.9 Tons Parcel Space In Fslr Coach (single Compartment) Of Train No. 16539(ex. Ypr To Majn)
Leasing Of 3.9 Tons Parcel Space In Fslr Coach (single Compartment) Of Train No. 22626 (ex. Sbc To Mas)
Leasing Of 3.9 Tons Parcel Space In
-Leasing-Of-3.9-Tons-Parcel-Space-In-Fslr-Coach-(single-Compartment)-Of-Train-No.-22626-(ex.-Sbc-To-Mas)-
-Leasing-Of-3.9-Tons-Parcel-Space-In>2025-12-24
India Providing Lt & Ht Line Shifting & Electrification Work At Hasaud Sarshiwa To Saraipali Odisa Border Road Block-bilaigarh Under Sub-division Sarangarh Distt. Sarangarh-bilaigarh (c.g.) Lt & Ht Line Shifting, Electrification Work 2025-12-24
-Development-Of-The-Pre-And-Post-Chlorine-Tonner-Connection-Room-Adjacent-To-Module-5-And-Chlorine-Tonner-Shed-Beside-Module-5-And-Module-1-At-New-100-Mgd-Wtp-Within-Igwtp>India -Development-Of-The-Pre-And-Post-Chlorine-Tonner-Connection-Room-Adjacent-To-Module-5-And-Chlorine-Tonner-Shed-Beside-Module-5-And-Module-1-At-New-100-Mgd-Wtp-Within-Igwtp>Kmc/ws/igwtp/078/25-26, Dt-21/11/2025
Development Of The Pre And Post Chlorine Tonner Connection Room Adjacent To Module-5 And Chlorine Tonner Shed Beside Module-5 And Module-1 At New 100 Mgd Wtp Within Igwtp
-Development-Of-The-Pre-And-Post-Chlorine-Tonner-Connection-Room-Adjacent-To-Module-5-And-Chlorine-Tonner-Shed-Beside-Module-5-And-Module-1-At-New-100-Mgd-Wtp-Within-Igwtp>2025-12-24
India Proposed Construction Of Weigh Bridge And Operator Room With 1000 Mt Godown Weigh Bridge, Operator Room, Godown 2025-12-24
India Construction Of Storm Water Drain And Culvert In Division No - 13 And 15 Of Hasthampatty Ward Office. 2025-12-24
India Spl Repaire To Lt Panel And Ug Cable With Connected Items At 14 Corps Under Age Em Ii Of Ge 865 Ews Leh 2025-12-24
India Spl Repair Of Building No To 74 Or Living Accn At 114 Fd Wksp Coy At 7014 Eme Bn And Provn Of Hard Standing Parking With Overhead Shed For Parking Vehicles At Office Complex At 31 Rr Cdo Under Ge 865 Ews Leh 2025-12-24
India Provision Of Certain Rw And Lbw Under Age B R Ii Of Ge 865 Ews Leh 2025-12-24
Whats app