Filter Search


Asia-Pacific


Location Summary Deadline
India Analytical Reagent (ar) Sulphuric Acid. .#* Analytical Reagent (ar) Sulphuric Acid Brand : Rankem Or Similar. Packing 2.5 Kg Bottle. (sp ecification - A Minimum Purity Of 98 % H2so4 By Weight ,a Clear Colourless Appearance ,a Specific Gravity A round 1.84 2025-07-03
-Shifting-Of-Old-Main-Water-Supply-Line-Passing-Beneath-The-Building-To-Outside-Near-Kairon-Block,-Sector-12,-Pgimer,-Chan>India -Shifting-Of-Old-Main-Water-Supply-Line-Passing-Beneath-The-Building-To-Outside-Near-Kairon-Block,-Sector-12,-Pgimer,-Chan>Shifting Of Old Main Water Supply Line Passing Beneath The Building To Outside Near Kairon Block, Sector 12, Pgimer, Chandigarh
Shifting Of Old Main Water Supply Line Passing Beneath The Building To Outside Near Kairon Block, Sector 12, Pgimer, Chan
-Shifting-Of-Old-Main-Water-Supply-Line-Passing-Beneath-The-Building-To-Outside-Near-Kairon-Block,-Sector-12,-Pgimer,-Chan>2025-07-03
India Set Of Following Items1) Locking Strip A [set Of Following Items1) Locking Strip As Per rcf Drg. No. Lg16132 Alt. D Item No. 9 2) Epdm 3 X 25 X45 As Per Rcf Drg. No. lg16132 Alt. D Item No. 6 (one Set Consists Of 01 Nos. Of Each Item)] .#* Set Of Followin 2025-07-03
India Supply Installation And Commissioning Of [supply Installation And Commissioning Of autoclave Pad (preset Automatic Digital) - Technical Specifications And Make As Per annexure-i Attached ( Warranty Period : Upto 30 Months From The Date Of Supply)] .#* Sup 2025-07-03
India Supply Of Lub Oil And Coolant Filter At Icd/wfd 2025-07-03
-Relining-Work-Of-Bickley-Kiln-Ii-At-Bhel-Sbd,-Malleswaram,-Bangalore>India -Relining-Work-Of-Bickley-Kiln-Ii-At-Bhel-Sbd,-Malleswaram,-Bangalore>Relining Work Of Bickley Kiln Ii
Relining Work Of Bickley Kiln Ii At Bhel Sbd, Malleswaram, Bangalore
-Relining-Work-Of-Bickley-Kiln-Ii-At-Bhel-Sbd,-Malleswaram,-Bangalore>2025-07-03
India Ondansetron 4 Mg/5 Mg Susp .#* (ph No. : 39020) Ondansetron 4 Mg/5 Mg Susp ] 2025-07-03
-Irrigation-Work>India -Irrigation-Work>Execution Of Reinforcement Work Of Guduramunda-i R.l. Project Under Bheden Block In Bargarh District
Irrigation Work
-Irrigation-Work>2025-07-03
India Amiodarone 150 Mg Inj .#* (ph No.:22080) Amiodarone 150 Mg Inj ] 2025-07-03
-Irrigation-Work>India -Irrigation-Work>Execution Of Reinforcement Work Of Amlipali-i R.l. Project Under Bheden Block In Bargarh District
Irrigation Work
-Irrigation-Work>2025-07-03
Whats app