Filter Search


Asia-Pacific


Location Summary Deadline
India Nala Nirman And Anya Vikas Karya Pooran Ke Makan Se Gandura Road Ki Aur Dinar 2025-12-29
India High Back Chair .#* Supply Of High Back Chair With Seat And Back Cushion And Pu Upholstery, Centre Tilt Mechanis m, Chrome Base With Nylon Castors. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-29
India A.e Work For Activation Of Central Channel After 300m D/s Of Kosi Barrage Upto 4.40 Km For Smooth Flow Of River In Central Region In A Width Of 30.00 M And Also Reduce Afflux In U/s Of Kosi Barrage With Suitable Bell Mouth And Having Slope 2:1 With Suitab 2025-12-29
India Supply Of Half Gear Half Rigid Coupling For 25t Rope Drum Hoist Of Depletion Sluice Gate Of Kanupur Irrigation Project Half Gear Half Rigid Coupling, 25t Rope Drum Hoist 2025-12-29
India Dustbin Aupply In Community Place At Gp Tarwala 2025-12-29
India N/w-a.e. Work For Belka Bochi & Chiliya Garaiya Tappu. Construction Of Total 24 Nos Stud At 8 Locations In A Group Of 3 Studs Of Size 12.0m X 6.0m In Boulder Crate (3m X 1.5m X 0.6m) Over Boulder Crated Base (1.5m X 1.5m X 0.6m) In Belka Bochi At Chilliya 2025-12-29
India Providing And Laying Of Three Row Purcupine Screen With Dampener @ 30m C/c Dully With Filled Jhaki And Tied With 10 Swg G.i. Wire In U/s Of Spur Km-6.80. Construction Of R.c.c M 200 With Nominal Mix (1:1.5:3) Porcupine Unit Of Six Legs (3.00x0.10x0.10) M 2025-12-29
India A.e. Work For Western Hr, Eastern Hr Of Kosi Barrage. A.e. Work For Downstream Of Right Guid Bundh Of Kosi Barrage. A.e. Work For Upstream Of Kosi Barrage. A.e. Work Between Km 0.83 To Km 0.9, Km1.13 To 1.42 And Km 1.66 To 1.74km Of Eab. A.e. Work At 1.80 2025-12-29
India A.e Work For Belka Bochi & Dumari Bote. The Work Involves Construction Of Embankments, Excavation, And Other Related Civil Engineering Tasks As Detailed In The Tender Document. The Successful Bidder Will Be Expected To Complete The Works By The Intended C 2025-12-29
Russian Federation Shut-off Valves 2025-12-29
Whats app