Filter Search


Asia-Pacific


Location Summary Deadline
-Punched-Washer-A18-Stainless-Steel-As-Per-Drg.no.-Is:2016-1967-200hv-a2-70-Tois:1367(part-14)-1984,-Packing-Instruction---Pi001-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Punched-Washer-A18-Stainless-Steel-As-Per-Drg.no.-Is:2016-1967-200hv-a2-70-Tois:1367(part-14)-1984,-Packing-Instruction---Pi001-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Punched Washer A18
Punched Washer A18 Stainless Steel As Per Drg.no. Is:2016-1967 200hv-a2-70 Tois:1367(part-14)-1984, Packing Instruction - Pi001 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Punched-Washer-A18-Stainless-Steel-As-Per-Drg.no.-Is:2016-1967-200hv-a2-70-Tois:1367(part-14)-1984,-Packing-Instruction---Pi001-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-16
-Packing-&-Packing-Shim-For-Boxnhl-To-Rdso-Drg.-No.-Wd-09034-s-08-Alt.06-Or-Latest-Item-No.10-&-19-(one-Set-Consisting-Of-Item-No-10-(packing)--04-Nos.-&-Item-19-(packing-Shim)--08-Nos-).-[-Warrant>India -Packing-&-Packing-Shim-For-Boxnhl-To-Rdso-Drg.-No.-Wd-09034-s-08-Alt.06-Or-Latest-Item-No.10-&-19-(one-Set-Consisting-Of-Item-No-10-(packing)--04-Nos.-&-Item-19-(packing-Shim)--08-Nos-).-[-Warrant>Tender Invited For Packing & Packing Shim For Boxnhl
Packing & Packing Shim For Boxnhl To Rdso Drg. No. Wd-09034-s-08 Alt.06 Or Latest Item No.10 & 19 (one Set Consisting Of Item No 10 (packing) -04 Nos. & Item 19 (packing Shim) -08 Nos ). [ Warrant
-Packing-&-Packing-Shim-For-Boxnhl-To-Rdso-Drg.-No.-Wd-09034-s-08-Alt.06-Or-Latest-Item-No.10-&-19-(one-Set-Consisting-Of-Item-No-10-(packing)--04-Nos.-&-Item-19-(packing-Shim)--08-Nos-).-[-Warrant>2025-05-16
India Clearance Of Jungle, Weed, Jala, Booti And Slush Etc. From The Inner Section Of Muradpur Drain In Between (rd 0-22000) And Shahbazpur Drain In Between( Rd 0-18180) And Joura Drain From In Between Rd (0-11800) Under Kasur Nallah System In District Tar 2025-05-16
-Name-Of-Work-Construction-Of-Bvkc-Hall-Revenue-Sub-headarmo-And-Some-Allied-Works-In-Bvk-Ground-Floor-At-Udyog-Nagar-Water-Tank-No.2-In-Nangloi-Jat-Ac-11(pid---16638.>India -Name-Of-Work-Construction-Of-Bvkc-Hall-Revenue-Sub-headarmo-And-Some-Allied-Works-In-Bvk-Ground-Floor-At-Udyog-Nagar-Water-Tank-No.2-In-Nangloi-Jat-Ac-11(pid---16638.>Name Of Work Construction Of Bvkc Hall( Revenue)
Name Of Work Construction Of Bvkc Hall Revenue Sub-headarmo And Some Allied Works In Bvk Ground Floor At Udyog Nagar Water Tank No.2 In Nangloi Jat Ac-11(pid - 16638.
-Name-Of-Work-Construction-Of-Bvkc-Hall-Revenue-Sub-headarmo-And-Some-Allied-Works-In-Bvk-Ground-Floor-At-Udyog-Nagar-Water-Tank-No.2-In-Nangloi-Jat-Ac-11(pid---16638.>2025-05-16
-Construction-Of-20-Seater-Jsc-Including-All-Developments-I.e.-Sewer-And-Water-Line-Etc-At-Mcd-Vacant-Land-Adjecent-To-Jj-Cluster-U-And-V-Block,-Shalimar-Bagh-Ac-14.-(pid---17055).>India -Construction-Of-20-Seater-Jsc-Including-All-Developments-I.e.-Sewer-And-Water-Line-Etc-At-Mcd-Vacant-Land-Adjecent-To-Jj-Cluster-U-And-V-Block,-Shalimar-Bagh-Ac-14.-(pid---17055).>Pay And Use Jsc (revenue).
Construction Of 20 Seater Jsc Including All Developments I.e. Sewer And Water Line Etc At Mcd Vacant Land Adjecent To Jj Cluster U And V Block, Shalimar Bagh Ac-14. (pid - 17055).
-Construction-Of-20-Seater-Jsc-Including-All-Developments-I.e.-Sewer-And-Water-Line-Etc-At-Mcd-Vacant-Land-Adjecent-To-Jj-Cluster-U-And-V-Block,-Shalimar-Bagh-Ac-14.-(pid---17055).>2025-05-16
-Set-Of-Gasket-Comprising-Of-09-Items-As-Per-Annexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Set-Of-Gasket-Comprising-Of-09-Items-As-Per-Annexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Set Of Gasket
Set Of Gasket Comprising Of 09 Items As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Set-Of-Gasket-Comprising-Of-09-Items-As-Per-Annexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-16
India Repair And Maintenance Of Infrastructure Assets In R-ii Division During 2024-25. Sh - Repair Of Damaged Footpath And Road Near Mausam Bhawan At Lodhi Road And At Najaf Khan Road Lodhi Colony 2025-05-16
-Supply-And-Laying-Of-Lt-Cable-Of-Size-400-Sqmm-3.5c-And-95-Sqmm-3.5c-For-Providing-Scc-And-Mb-Charging-Of-E_rickshaw-E-vehicles-At-Ndmc-Auto-Work-Shop,-Ground-Floor,-Laxmi-Bai-Nagar,-New-Delhi>India -Supply-And-Laying-Of-Lt-Cable-Of-Size-400-Sqmm-3.5c-And-95-Sqmm-3.5c-For-Providing-Scc-And-Mb-Charging-Of-E_rickshaw-E-vehicles-At-Ndmc-Auto-Work-Shop,-Ground-Floor,-Laxmi-Bai-Nagar,-New-Delhi>11/ee(d/s)/2025-2026
Supply And Laying Of Lt Cable Of Size 400 Sqmm 3.5c And 95 Sqmm 3.5c For Providing Scc And Mb Charging Of E_rickshaw E-vehicles At Ndmc Auto Work Shop, Ground Floor, Laxmi Bai Nagar, New Delhi
-Supply-And-Laying-Of-Lt-Cable-Of-Size-400-Sqmm-3.5c-And-95-Sqmm-3.5c-For-Providing-Scc-And-Mb-Charging-Of-E_rickshaw-E-vehicles-At-Ndmc-Auto-Work-Shop,-Ground-Floor,-Laxmi-Bai-Nagar,-New-Delhi>2025-05-16
-04/ee(bm-ii)/2025-26>India -04/ee(bm-ii)/2025-26>Improvement To Palika Bhawan Complex, R.k Puram Sh Providing Supplying And Commissioning Of Dewatering Pump At Palika Bhawan Complex R K Puram Sec-13
04/ee(bm-ii)/2025-26
-04/ee(bm-ii)/2025-26>2025-05-16
-Development-Of-Green-Strip-At-Nyay-Marg,-Chanakyapuri>India -Development-Of-Green-Strip-At-Nyay-Marg,-Chanakyapuri>D/o Green Strip Along With Major Roads 2025-26.
Development Of Green Strip At Nyay Marg, Chanakyapuri
-Development-Of-Green-Strip-At-Nyay-Marg,-Chanakyapuri>2025-05-16
Whats app