Filter Search


Asia-Pacific


Location Summary Deadline
India Safety Strap .#* Safety Strap For Equalizing Stay As Per Dc/emu/m-0-5-011 ,item No -1 Attached [ warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: max 8 2025-12-19
India Supply Of Tool .#* Supply Of Tool As Per Annexure Attached Make-taparia/jhalam Or Equivalent [ W arranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: max 8 2025-12-19
India Up Gradation Of Various Roads In City. 2025-12-19
-Repairing-Of-Road-Surface-From-1-No-To-20-B.b.m-Lane-In-Ward-No-038>India -Repairing-Of-Road-Surface-From-1-No-To-20-B.b.m-Lane-In-Ward-No-038>Kmc/eec/iv/038/apas-15/25-26/r
Repairing Of Road Surface From 1 No To 20 B.b.m Lane In Ward No-038
-Repairing-Of-Road-Surface-From-1-No-To-20-B.b.m-Lane-In-Ward-No-038>2025-12-19
India Construction Of Shed Near Kusum Pukur, Mouza- Chakaltore Jl No.120under Indpur Gp (apas/01/248/257/0001) 2025-12-19
India Construction Of Shed At Mekhadya Near Kalimela, Mouza- Natherdanga, Jl No. 39 Under Brahmandiha Gp (apas/01/248/206/0002) 2025-12-19
India Temporary Construction Of Pandal For Stall And Welcome Gate, B And C Zone Stage For Mukutmonipur Mela 2026 For 3 Days 2025-12-19
India Construction Of Tin Shed At Chhatrabaid Community Hall, Mouza- Chhatrabaid, Jl No -123 Within Indpur Dev. Block (apas/01/248/259/0002) 2025-12-19
India Installation Of 10 Nos Of Street Lights On The Street Of Mondalhat Paschim Madhyapara 2025-12-19
India Installation Of Solar Street Light And 1 No Of Seating Bench Nearby Boalia Para Kalimandir 2025-12-19
Whats app