Filter Search


Asia-Pacific


Location Summary Deadline
-Sinking-Tube-Well,inter-Connection-Beteween-Tw-And-Existing-Pipe-Line-,boundary-Wall-Laying-Distribution-System-Of-Konar-Piped-Water-Supply-Scheme-At-Harishchandrapur--i-Block-Of-Malda-District-Under-Malda>India -Sinking-Tube-Well,inter-Connection-Beteween-Tw-And-Existing-Pipe-Line-,boundary-Wall-Laying-Distribution-System-Of-Konar-Piped-Water-Supply-Scheme-At-Harishchandrapur--i-Block-Of-Malda-District-Under-Malda>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.03
Sinking Tube Well,inter Connection Beteween Tw And Existing Pipe Line ,boundary Wall Laying Distribution System Of Konar Piped Water Supply Scheme At Harishchandrapur -i Block Of Malda District Under Malda
-Sinking-Tube-Well,inter-Connection-Beteween-Tw-And-Existing-Pipe-Line-,boundary-Wall-Laying-Distribution-System-Of-Konar-Piped-Water-Supply-Scheme-At-Harishchandrapur--i-Block-Of-Malda-District-Under-Malda>2025-05-26
-Dedicated/parallel-Pipe-Line-For-Better-Functionality-Of-Paro-Piped-Water-Supply-Scheme-At-Harishchandrapur-i-Block-Of-Malda-District-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>India -Dedicated/parallel-Pipe-Line-For-Better-Functionality-Of-Paro-Piped-Water-Supply-Scheme-At-Harishchandrapur-i-Block-Of-Malda-District-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.05
Dedicated/parallel Pipe Line For Better Functionality Of Paro Piped Water Supply Scheme At Harishchandrapur-i Block Of Malda District Under Malda Division, Phe Dte, Govt. Of West Bengal.
-Dedicated/parallel-Pipe-Line-For-Better-Functionality-Of-Paro-Piped-Water-Supply-Scheme-At-Harishchandrapur-i-Block-Of-Malda-District-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>2025-05-26
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well-Of-250.0-M-Deep-At-3rd-Tw-,inter-Connection-Beteween-Existing-And-New-Pipe-Line-,laying-Of-Dedicated/parallel-Pipe-Line-And-Balance-Fhtc-Of-Khanpur-Hulaspu>India -Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well-Of-250.0-M-Deep-At-3rd-Tw-,inter-Connection-Beteween-Existing-And-New-Pipe-Line-,laying-Of-Dedicated/parallel-Pipe-Line-And-Balance-Fhtc-Of-Khanpur-Hulaspu>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.06
Sinking Of 200mm (all Through) Big Dia. Tube Well Of 250.0 M Deep At 3rd Tw ,inter Connection Beteween Existing And New Pipe Line ,laying Of Dedicated/parallel Pipe Line And Balance Fhtc Of Khanpur Hulaspu
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well-Of-250.0-M-Deep-At-3rd-Tw-,inter-Connection-Beteween-Existing-And-New-Pipe-Line-,laying-Of-Dedicated/parallel-Pipe-Line-And-Balance-Fhtc-Of-Khanpur-Hulaspu>2025-05-26
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well-Of-250-Mtr.-Deep-,-Construction-Of-Boundary-Wall-And-Pump-House,-Interconnection-And-Laying-Of-Dedicated/parallel-Pipe-Line-For-Dakshin-Sahar-Water-Supply>India -Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well-Of-250-Mtr.-Deep-,-Construction-Of-Boundary-Wall-And-Pump-House,-Interconnection-And-Laying-Of-Dedicated/parallel-Pipe-Line-For-Dakshin-Sahar-Water-Supply>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.07
Sinking Of 200mm (all Through) Big Dia. Tube Well Of 250 Mtr. Deep , Construction Of Boundary Wall And Pump House, Interconnection And Laying Of Dedicated/parallel Pipe Line For Dakshin Sahar Water Supply
-Sinking-Of-200mm-(all-Through)-Big-Dia.-Tube-Well-Of-250-Mtr.-Deep-,-Construction-Of-Boundary-Wall-And-Pump-House,-Interconnection-And-Laying-Of-Dedicated/parallel-Pipe-Line-For-Dakshin-Sahar-Water-Supply>2025-05-26
-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-35-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>India -Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-35-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.08
Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 35 M3/hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Wate
-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-35-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>2025-05-26
-Invitation-Of-Bids-For-Supply-Of-1,67,053-Quantity-Of-Rd-40mm-High-Explosive-Dual-Purpose-(hedp)>India -Invitation-Of-Bids-For-Supply-Of-1,67,053-Quantity-Of-Rd-40mm-High-Explosive-Dual-Purpose-(hedp)>Request For Proposal (rfp) No A/18120/40mm Mgl Hedp/mgs/brig Proc (a) Dt 30 Apr 2025
Invitation Of Bids For Supply Of 1,67,053 Quantity Of Rd 40mm High Explosive Dual Purpose (hedp)
-Invitation-Of-Bids-For-Supply-Of-1,67,053-Quantity-Of-Rd-40mm-High-Explosive-Dual-Purpose-(hedp)>2025-05-26
-Invitation-Of-Bids-For-Supply-Of-2,85,779-Quantity-Of-Rd-40mm-High-Explosive-Anti-personnel-(heap)>India -Invitation-Of-Bids-For-Supply-Of-2,85,779-Quantity-Of-Rd-40mm-High-Explosive-Anti-personnel-(heap)>Request For Proposal (rfp) No A/18120/40mm Mgl Heap/mgs/brig Proc (a) Dt 30 Apr 2025
Invitation Of Bids For Supply Of 2,85,779 Quantity Of Rd 40mm High Explosive Anti-personnel (heap)
-Invitation-Of-Bids-For-Supply-Of-2,85,779-Quantity-Of-Rd-40mm-High-Explosive-Anti-personnel-(heap)>2025-05-26
India Periodical Services Cum Welcome Maintenance And Tiling Work And Other Connected B/r Items In Certain Bldg In Cqa (a), Nai And Sqae Area Under Ge(central) Khadki. 2025-05-26
India Increasing Capacity 2x200 To 1x160 Mva To 2x200 To 2x160 Mva Transformer, 132 Kv Bus Couplar Bay And Extension Of C.r.b At 220 Kv Sub Station Sahupuri, Distt Chandauli 2025-05-26
qty:5
>India
qty:5
>Tender Invited For Log Boom Barrier, Site Survey For Design Input To Prepare Effective System, Providing Down Stream Anchoring, Providing Pedestal Anchor, Installing Log Boom Float
qty:5
qty:5
>2025-05-26
Whats app