Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Ohsr-At-Golecha-School-,-Khed-Road-And-New-Bus-Stand,-Uwss-Balotra,-District-Balotra,-2025-26>India -Construction-Of-Ohsr-At-Golecha-School-,-Khed-Road-And-New-Bus-Stand,-Uwss-Balotra,-District-Balotra,-2025-26>Nit No. 07/2025-26 Of Ace Phed Region Ii Jodhpur
Construction Of Ohsr At Golecha School , Khed Road And New Bus Stand, Uwss Balotra, District Balotra, 2025-26
-Construction-Of-Ohsr-At-Golecha-School-,-Khed-Road-And-New-Bus-Stand,-Uwss-Balotra,-District-Balotra,-2025-26>2025-05-26
-Design,-Supplying.-Fabrication,-Erection-An-Commissioning-Including-3-(three)-Months-Trial-Run-Of-25m3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-And-Backwash-Water-Disposal-At-Head-Work-Site-And-La>India -Design,-Supplying.-Fabrication,-Erection-An-Commissioning-Including-3-(three)-Months-Trial-Run-Of-25m3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-And-Backwash-Water-Disposal-At-Head-Work-Site-And-La>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.01
Design, Supplying. Fabrication, Erection An Commissioning Including 3 (three) Months Trial Run Of 25m3/hr. Capacity Pressure Type Iron Elimination Plant And Backwash Water Disposal At Head Work Site And La
-Design,-Supplying.-Fabrication,-Erection-An-Commissioning-Including-3-(three)-Months-Trial-Run-Of-25m3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-And-Backwash-Water-Disposal-At-Head-Work-Site-And-La>2025-05-26
-Restoration-Of-Road-At-Chanchal-Zone--i-Water-Supply-Scheme-Under-Chanchal--i-Block-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.>India -Restoration-Of-Road-At-Chanchal-Zone--i-Water-Supply-Scheme-Under-Chanchal--i-Block-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.10
Restoration Of Road At Chanchal Zone -i Water Supply Scheme Under Chanchal -i Block Under Malda Division, Phe Dte. In The District Of Malda.
-Restoration-Of-Road-At-Chanchal-Zone--i-Water-Supply-Scheme-Under-Chanchal--i-Block-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.>2025-05-26
-Construction-Of-Approach-Road-At-Ohr-And-2nd-Tube-Well-Site-With-Land-Development,-Laying-Of-Parallel/dedicated-Pipeline-For-Better-Functionality-And-Design,-Supplying.-Fabrication,-Erection-And-Commission>India -Construction-Of-Approach-Road-At-Ohr-And-2nd-Tube-Well-Site-With-Land-Development,-Laying-Of-Parallel/dedicated-Pipeline-For-Better-Functionality-And-Design,-Supplying.-Fabrication,-Erection-And-Commission>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.11
Construction Of Approach Road At Ohr And 2nd Tube Well Site With Land Development, Laying Of Parallel/dedicated Pipeline For Better Functionality And Design, Supplying. Fabrication, Erection And Commission
-Construction-Of-Approach-Road-At-Ohr-And-2nd-Tube-Well-Site-With-Land-Development,-Laying-Of-Parallel/dedicated-Pipeline-For-Better-Functionality-And-Design,-Supplying.-Fabrication,-Erection-And-Commission>2025-05-26
-Restoration-Of-Road-At-Chanchal-Zone--iii-Water-Supply-Scheme-Under-Chanchal--i-Block-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.>India -Restoration-Of-Road-At-Chanchal-Zone--iii-Water-Supply-Scheme-Under-Chanchal--i-Block-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.12
Restoration Of Road At Chanchal Zone -iii Water Supply Scheme Under Chanchal -i Block Under Malda Division, Phe Dte. In The District Of Malda.
-Restoration-Of-Road-At-Chanchal-Zone--iii-Water-Supply-Scheme-Under-Chanchal--i-Block-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.>2025-05-26
-Construction-Of-Storm-Water-Drain,-Parapet-Wall,-Protective-And-Allied-Works-From-Chainage-6.00-Kmp-To-14.00-Kmp-(in-Stretches)-Including-The-Landslide-Zone-From-Ch.-10.00-Kmp-To-11.00-Kmp-Of-Garidhura---Mirik---Simanabusty-Road-Etc.etc.>India -Construction-Of-Storm-Water-Drain,-Parapet-Wall,-Protective-And-Allied-Works-From-Chainage-6.00-Kmp-To-14.00-Kmp-(in-Stretches)-Including-The-Landslide-Zone-From-Ch.-10.00-Kmp-To-11.00-Kmp-Of-Garidhura---Mirik---Simanabusty-Road-Etc.etc.>Road Works
Construction Of Storm Water Drain, Parapet Wall, Protective And Allied Works From Chainage 6.00 Kmp To 14.00 Kmp (in Stretches) Including The Landslide Zone From Ch. 10.00 Kmp To 11.00 Kmp Of Garidhura - Mirik - Simanabusty Road Etc.etc.
-Construction-Of-Storm-Water-Drain,-Parapet-Wall,-Protective-And-Allied-Works-From-Chainage-6.00-Kmp-To-14.00-Kmp-(in-Stretches)-Including-The-Landslide-Zone-From-Ch.-10.00-Kmp-To-11.00-Kmp-Of-Garidhura---Mirik---Simanabusty-Road-Etc.etc.>2025-05-26
-Sinking-Of-Additional-Tube-Well-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Inter-Connection,-Pump-House,-Approach-Road-Of-Jalalpur-Piped-Water-Supply-Scheme-At-Chanchal--ii-Block-Of-Malda-Di>India -Sinking-Of-Additional-Tube-Well-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Inter-Connection,-Pump-House,-Approach-Road-Of-Jalalpur-Piped-Water-Supply-Scheme-At-Chanchal--ii-Block-Of-Malda-Di>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.13
Sinking Of Additional Tube Well To Resolve Tail End Pressure Along With Allied Works Like Inter Connection, Pump House, Approach Road Of Jalalpur Piped Water Supply Scheme At Chanchal -ii Block Of Malda Di
-Sinking-Of-Additional-Tube-Well-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Inter-Connection,-Pump-House,-Approach-Road-Of-Jalalpur-Piped-Water-Supply-Scheme-At-Chanchal--ii-Block-Of-Malda-Di>2025-05-26
-Sinking-Of-Additional-Tube-Well-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Inter-Connection,-Pump-House,-Approach-Road-Of-Khanpur-Piped-Water-Supply-Scheme-At-Chanchal--ii-Block-Of-Malda-Dis>India -Sinking-Of-Additional-Tube-Well-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Inter-Connection,-Pump-House,-Approach-Road-Of-Khanpur-Piped-Water-Supply-Scheme-At-Chanchal--ii-Block-Of-Malda-Dis>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.14
Sinking Of Additional Tube Well To Resolve Tail End Pressure Along With Allied Works Like Inter Connection, Pump House, Approach Road Of Khanpur Piped Water Supply Scheme At Chanchal -ii Block Of Malda Dis
-Sinking-Of-Additional-Tube-Well-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Inter-Connection,-Pump-House,-Approach-Road-Of-Khanpur-Piped-Water-Supply-Scheme-At-Chanchal--ii-Block-Of-Malda-Dis>2025-05-26
-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-40-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>India -Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-40-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.15
Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 40 M3/hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Wate
-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-40-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>2025-05-26
-Laying-Of-Parallel/dedicated-Pipeline-Improvement-Of-Functionality,-Providing-Balance-Fhtc-And-Construction-Of-Boundary-Wall-Of-Talbangura-Water-Supply-Scheme-Of-Harishchandrapur-ii-Block-Under-Malda-Divis>India -Laying-Of-Parallel/dedicated-Pipeline-Improvement-Of-Functionality,-Providing-Balance-Fhtc-And-Construction-Of-Boundary-Wall-Of-Talbangura-Water-Supply-Scheme-Of-Harishchandrapur-ii-Block-Under-Malda-Divis>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.17
Laying Of Parallel/dedicated Pipeline Improvement Of Functionality, Providing Balance Fhtc And Construction Of Boundary Wall Of Talbangura Water Supply Scheme Of Harishchandrapur-ii Block Under Malda Divis
-Laying-Of-Parallel/dedicated-Pipeline-Improvement-Of-Functionality,-Providing-Balance-Fhtc-And-Construction-Of-Boundary-Wall-Of-Talbangura-Water-Supply-Scheme-Of-Harishchandrapur-ii-Block-Under-Malda-Divis>2025-05-26
Whats app