Filter Search


Asia-Pacific


Location Summary Deadline
India Providing & Installation of Gym Item in Various Colleges Under Chief Minister’s Area Development Scheme. 2025-05-26
Taiwan Province of China Hsing Chung Parking Lot New Construction-intelligent Tranportation Center Extension 2025-05-26
Philippines Geo-resistivity Survey For Potential Groundwater Source In The Municipality Of Magsingal 2025-05-26
-Repair-And-Hp-hvof-Coating-Work-Of-Two-Set-(48-Nos)-Guide-Vanes-Of-Salal-Power-Station>India -Repair-And-Hp-hvof-Coating-Work-Of-Two-Set-(48-Nos)-Guide-Vanes-Of-Salal-Power-Station>Repair And Hp-hvof Coating Work Of Two Set (48 Nos) Guide Vanes Of Salal Power Station
Repair And Hp-hvof Coating Work Of Two Set (48 Nos) Guide Vanes Of Salal Power Station
-Repair-And-Hp-hvof-Coating-Work-Of-Two-Set-(48-Nos)-Guide-Vanes-Of-Salal-Power-Station>2025-05-26
-Open-E-Tender-For-Licensing-Of-Spaces-On-Pillars-Of-Airport-Express-Line-For-Pl>India -Open-E-Tender-For-Licensing-Of-Spaces-On-Pillars-Of-Airport-Express-Line-For-Pl>Open E Tender For Licensing Of Spaces On Pillars Of Airport Express Line For Placement And Operation Of Telecom Equipments For Providing Mobile Cellular Coverage Upto 5g
Open E Tender For Licensing Of Spaces On Pillars Of Airport Express Line For Pl
-Open-E-Tender-For-Licensing-Of-Spaces-On-Pillars-Of-Airport-Express-Line-For-Pl>2025-05-26
India Eicher Engine Assy. E-494 F/l Bs-iv/ab/ps100kw/nac/230c/am 2025-05-26
India Appointment Of Project Management Consultancy (pmc) For Kharghar Coastal Road (kcr) Project, Navi Mumbai. 2025-05-26
-Mtc.-Of-Railway-Track-In-Ggsstp-Railway-Yard-(equated-Length-35.266km)-And-Railway-Track-From-Ropar-Railway-Station-To-Ggsstp-Railway-Station-(rtp-Block-Section)-Equated-Length-7.506-Km>India -Mtc.-Of-Railway-Track-In-Ggsstp-Railway-Yard-(equated-Length-35.266km)-And-Railway-Track-From-Ropar-Railway-Station-To-Ggsstp-Railway-Station-(rtp-Block-Section)-Equated-Length-7.506-Km>612/ P1/empw12981 Dated 28.04.25
Mtc. Of Railway Track In Ggsstp Railway Yard (equated Length 35.266km) And Railway Track From Ropar Railway Station To Ggsstp Railway Station (rtp Block Section) Equated Length 7.506 Km
-Mtc.-Of-Railway-Track-In-Ggsstp-Railway-Yard-(equated-Length-35.266km)-And-Railway-Track-From-Ropar-Railway-Station-To-Ggsstp-Railway-Station-(rtp-Block-Section)-Equated-Length-7.506-Km>2025-05-26
India Construction/ Extension Of Field Channel/ Drains At Work Site Banjar Yen In Village Sadipora For A Length Of 250 Mts. From Rd 20-170 And 300-400 -- Project Kousarnag -- Estimated Cost Rs. 609200 -- 2025-05-26
-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-30-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>India -Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-30-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.16
Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 30 M3/hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Wate
-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-30-M3/hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-And-Backwash-Wate>2025-05-26
Whats app