Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Cc Road From Shyampur Paka Rasta To Surajit Mondal House Jl No-79 Under Shyampur Gp Under Shyampur-i Panchayat Samity Under Apas Fund 24-25 Scheme Id Apas 01 179 183 0004 2025-10-13
India Contructions Of Tali Piling Near Hriseekesh Manna Ponds Jl No-103 Under Baneswarpur - Ii Gp Under Shyampur-i Panchayat Samity Under Apas Fund 24-25 Scheme Id Apas 01 179 281 0004 2025-10-13
India Construction Of Cover Drain From Shyampur Achinta Bhowmik House To Sidheswar Poria Garden Jl No-79 Under Shyampur Gp Under Shyampur-i Panchayat Samity Under Apas Fund 24-25 Scheme Id Apas 01 179 183 0003 2025-10-13
India Construction Of Cc Road From Satish Mondal House To Pritam Samanta House With Pilling At Baneswarpur Mouza Jl No 101 Under Baneswarpur - I Gp Under Shyampur-i Panchayat Samity Under Apas Fund 24-25 Scheme Id Apas 01 179 291 0004 2025-10-13
India Solar Light At Khosnagar Maji Para 2025-10-13
India Installation Of Submarsible Pump With Pipeline Near Nemai Kayal House At Gadiara Under Baneswarpur-i Gram Panchayatat Under Shyampur-i Panchayat Samity Under 15 Th Fc Tied Fund 24-25 Activity Code- 125958055 2025-10-13
India Purchase Of Materials (supplies) For The Operation Of The Chief Minister''''s Old Age Shelter. Bed, Chair, Table, Cooler, Heater, Water Purifier, Geyser, Fan, Projector, Laptop, Desktop, Printer, Medical Equipment 2025-10-13
-Repair,-Replacement-And-Renovation-Of-Electrical-Installation-Works-At-Barrack-No.-7-Of-1st-Bn.,-Kap,-Body-Guard-Lines,-Kolkata-27-For-The-Financial-Year-202>India -Repair,-Replacement-And-Renovation-Of-Electrical-Installation-Works-At-Barrack-No.-7-Of-1st-Bn.,-Kap,-Body-Guard-Lines,-Kolkata-27-For-The-Financial-Year-202>Repair, Replacement And Renovation Of Electrical Installation Works At Barrack No. 7 At Bgl
Repair, Replacement And Renovation Of Electrical Installation Works At Barrack No. 7 Of 1st Bn., Kap, Body Guard Lines, Kolkata 27 For The Financial Year 202
-Repair,-Replacement-And-Renovation-Of-Electrical-Installation-Works-At-Barrack-No.-7-Of-1st-Bn.,-Kap,-Body-Guard-Lines,-Kolkata-27-For-The-Financial-Year-202>2025-10-13
India Annual Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler Of Chp, Bktps For A Period Of 2 Years. 2025-10-13
India Restoration Of Ash Slurry Disposal Lines Asdl From Dp 4 To Dp 5 At New Ash Pond Area Under Ahp-mm, Bktps 2025-10-13
Whats app