Filter Search


Asia-Pacific


Location Summary Deadline
India Front Part Replacement Kit For Lhb Type Coaches As Per Attached Drawings And annexure-i. .#* Front Part Replacement Kit For Lhb Type Coaches As Per Attached Drawings And Annexure-i. [ warranty Period: 36 Months After The Date Of Delivery ] ] 2025-12-17
India Solar 25kwp, Urvey, Design, Fabrication, Supply, Installation, Testing & Commissioning Of Total 25 Kwp Of on Grid Connected Rooftop Solar Pv Power Plant Including Comprehensive Maintenance Contract (cmc) For 3 Years 2025-12-17
India Control Card Motorpal Fip .#* Supply Of Control Card Motorpal Fip Part No. 105200246059 As Per Rcf Rate Cont ract No. Rcf/rate Contract/daspares/greaves/02241191 Dt. 23.08.2024 Page No. 18 Item Sr.no. 4 6 Make Greaves Cotton Or Exactly Similar. Note: This 2025-12-17
India White Soft Paraffin (vaseline White) 1kg. Jar .#* White Soft Paraffin (vaseline White) 1kg. Jar ] 2025-12-17
India Construction Of Road From Pwd Road To Dhelei Via Dipapali, Bagharmunda Road In The District Of Subarnapur Under Mmsy-trip For The Year 2025-26 2025-12-17
India 7mm Round Copper Dropper Wires As Per Rdso Specification No.is-282, Str: Core- str-03. Make: Rdso/core Approved Source Only. Note-material To Be Procured from Rdso/core Approved Sources Only. Rdso Id 3100640 Sub Id 3100640001 .#* 7mm Round Copper Dropper 2025-12-17
India Adhesive Elastic Bandage Size - 10 Cm X 4 Mtrs. In Plastic/tin Container .#* Adhesive Elastic Bandage Size - 10 Cm X 4 Mtrs. In Plastic/tin Container ] 2025-12-17
India Renovation Of Outlet System From Ansupa Sweet Water Lake To River Mahanadi Of Banki Block In Cuttack District. 2025-12-17
India Carrier Plate Complete To M/s Repl Pt. No. S1607/, Drg.am-400019-r1 Or m/s Aal (now M/s Anantshree) Pt. No. G1607/drg. 9980383548801 .#* Carrier Plate Complete To M/s Repl Pt. No. S1607/, Drg.am-400019-r1 Or M/s Aa l (now M/s Anantshree) Pt. No. G1607/drg 2025-12-17
India Construction & Maintenance Of Long Span Bridges Under Pm-janman Rural Connectivity, Including Maintenance For Five Years. The Work Involves Construction And Upgradation Of Rural Roads As Per The Bill Of Quantities (boq) Sanctioned For Various Districts In 2025-12-17
Whats app