Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>India -Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>Gir-2
Construction Of Toilet (1.20m X 0.90m And 2.10m Hight With 1 No. Leachpit Size 1.00m Internal Dia X 1.00 M Depth In Anganbari Centre Under D.w.and S Division, No.-1, Giridih For The Year 2025-26. (deposit Fund)
-Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>2025-12-19
-Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>India -Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>Gir-3
Construction Of Toilet (1.20m X 0.90m And 2.10m Hight With 1 No. Leachpit Size 1.00m Internal Dia X 1.00 M Depth In Anganbari Centre Under D.w.and S Division, No.-1, Giridih For The Year 2025-26. (deposit Fund)
-Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>2025-12-19
-Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>India -Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>Gir-4
Construction Of Toilet (1.20m X 0.90m And 2.10m Hight With 1 No. Leachpit Size 1.00m Internal Dia X 1.00 M Depth In Anganbari Centre Under D.w.and S Division, No.-1, Giridih For The Year 2025-26. (deposit Fund)
-Construction-Of-Toilet-(1.20m-X-0.90m-And-2.10m-Hight-With-1-No.-Leachpit-Size-1.00m-Internal-Dia-X-1.00-M-Depth-In-Anganbari-Centre-Under-D.w.and-S-Division,-No.-1,-Giridih-For-The-Year-2025-26.-(deposit-Fund)>2025-12-19
India Expression Of Interest For Selection Of Back End Partner For Supply, Installation, Testing & Commissioning Of Desktop Computer System. 2025-12-19
India Annual Maintenance Contract Of Civil Works Of Residential And Non-residential Building Of Bhep, Balimela. 2025-12-19
India Oil Centrifuging Replacement Of High Tan Delta Value Y Phase Hv Bushing Of 132/33kv 63 Mva T/f At 220kv S/s Basti And 132kv S/s Harraiya And Replacement Of Punctured Aircell In Conservator Of 132/33kv 63mva T/f At 220kv S/s Basti Under Etd-i Basti. 2025-12-19
India Supply Of Castings 2025-12-19
India Supply Of Castings, Supply Of Castings 2025-12-19
India Construction Of 20 Nos. T/wells In Village Shivpur Pandra, Kailas Nagar, Karluhi, Lower Andora, Pirthipur, T/well Harwal, Bhaderkali (maira Amb Harizan Basti), Dangoh, Dangoh-ii, Lower Joh Beh, Joh, Dangoh Khas, Sanghnai T/well No. 1 Kaloh (improveme 2025-12-19
-Comprehensive-Running-Maintenance-And-Operation-Vrv/vrf-System-Including-Running-Maintenance-Of-Split,-Window-Ac-And-Water-Cooler-At-Hari-Nagar-Sports-Complex.>India -Comprehensive-Running-Maintenance-And-Operation-Vrv/vrf-System-Including-Running-Maintenance-Of-Split,-Window-Ac-And-Water-Cooler-At-Hari-Nagar-Sports-Complex.>Maintenance Of Various Sports Complexes.
Comprehensive Running Maintenance And Operation Vrv/vrf System Including Running Maintenance Of Split, Window Ac And Water Cooler At Hari Nagar Sports Complex.
-Comprehensive-Running-Maintenance-And-Operation-Vrv/vrf-System-Including-Running-Maintenance-Of-Split,-Window-Ac-And-Water-Cooler-At-Hari-Nagar-Sports-Complex.>2025-12-19
Whats app