Filter Search


Asia-Pacific


Location Summary Deadline
India C/o24 And 45m(both Carriageway) Wide Road For Approach Of Film City In Sector-21 Yea(including 5 Years Maintenance) Wc-02 2025-08-19
India Development Work Of Sector-18 (road ,sewer ,drain And Water Supply) Pocket2a And 2c(balance Work) In Yea. Wc-01 2025-08-19
India Construction And Development Of Common Infrastructure Facility Food Court , Bank,recereational Area,gym And Public Utilites In Medical Device Park At Sector 28 ,yeida.wc-04 2025-08-19
India C/o Main Carriageway (both Side ) Of 100mtr Wide Road Between Sec-21 And 34,35 Yea (including 5 Year Maintenance) Wc-02 2025-08-19
India Resurfacing Work On 45mtr Wide Road Both Side Carraigway (part-b) In Sector -24 Yeida. Wc-04 2025-08-19
India O/m Of Msps/sps And Sewer Line Along Expressway (replacement Of Unserviceable/damage Psc Pressure Pipe Line Into D.i. Pressure Pipe Line From Ips-4(chainge 2.10 Km To 3.05 Km) Along Lhs Of Expressway)noida 2025-08-19
India Beautification With Ms Cnc Cut Grill With Illuminated Noida Logo And Led Bollard Lights At Sector-62 Goal Chakkar And Connected Tripods , Noida 2025-08-19
-Bottle-Shape-Plastic-Waste-Collection-Cage-(1.6-Length-With-Stand).>India -Bottle-Shape-Plastic-Waste-Collection-Cage-(1.6-Length-With-Stand).>Bottle Shape Plastic Waste Collection Cage 18-de/smp/2025-26
Bottle Shape Plastic Waste Collection Cage (1.6 Length With Stand).
-Bottle-Shape-Plastic-Waste-Collection-Cage-(1.6-Length-With-Stand).>2025-08-19
-Fish-Shape-Plastic-Waste-Collection-Cage>India -Fish-Shape-Plastic-Waste-Collection-Cage>Fish Shape Plastic Waste Collection Cage 18-de/smp/2025-26
Fish Shape Plastic Waste Collection Cage
-Fish-Shape-Plastic-Waste-Collection-Cage>2025-08-19
-Wall-Writing-On-Smooth,-Durable-Wall-Surface-(preferably-Of-Govt.-Premises-Or-Boundary-Wall)-By-Cleaning-The-Surface-Thoroughly,-Removing-Old-Paints,-Preparing-With-One-Coat-Good-Qu>India -Wall-Writing-On-Smooth,-Durable-Wall-Surface-(preferably-Of-Govt.-Premises-Or-Boundary-Wall)-By-Cleaning-The-Surface-Thoroughly,-Removing-Old-Paints,-Preparing-With-One-Coat-Good-Qu>Wall Writing On Smooth, Durable Wall Surface Nieq 17-de/smp/2025-26
Wall Writing On Smooth, Durable Wall Surface (preferably Of Govt. Premises Or Boundary Wall) By Cleaning The Surface Thoroughly, Removing Old Paints, Preparing With One Coat Good Qu
-Wall-Writing-On-Smooth,-Durable-Wall-Surface-(preferably-Of-Govt.-Premises-Or-Boundary-Wall)-By-Cleaning-The-Surface-Thoroughly,-Removing-Old-Paints,-Preparing-With-One-Coat-Good-Qu>2025-08-19
Whats app