Filter Search


Asia-Pacific


Location Summary Deadline
India Operation And Guarding Of High Lift Pumping Machinery Alongwith Sludge Pump, Recirculation Pump, Backwash Valve At Beldanga W/s Scheme Under Mahyampur-beldanga Surface Based W_s Scheme Under Medb Phe Dte 2026-01-16
India Construction Work Of Indoor Stadium In Ward Number 09 2026-01-16
India The Principal Chief Materials Manager (pcmm), East Coast Railway, Bhubaneswar, Invites E-tenders From Established And Reliable Manufacturers Or Their Authorized Agents For The Supply Of Items As Set Forth In The E-tender Uploaded On The Ireps Website. Ten 2026-01-16
-R>India -R>Consultancy Services For Preparation Of Dpr For Rehabilitation And Upgradation Of Existing Road Between Km 29.300 To Km 86.120 Jhala To Heena From Existing/single Lane To Double Lane With Paved Shoulder Specification On Gangotri-uttarkashi-dharasu
R
-R>2026-01-16
Philippines Concreting Of Bisag Farm To Market Road Phase Ii 2026-01-16
Malaysia Electrical Installation For Health Clinic Type 3 With Mak Mandin Integration Quarters, Penang Island 2026-01-16
-Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipeline-(di/ci/upvc/hdpe),-Rbtw,-Stand-Post,-Fhtc-And-Operation-Of-Sluice-Valve-Of-Water-Supply-Scheme>India -Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipeline-(di/ci/upvc/hdpe),-Rbtw,-Stand-Post,-Fhtc-And-Operation-Of-Sluice-Valve-Of-Water-Supply-Scheme>Niet No. - 26 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte. (sl.no-34)
Day To Day Operation And Maintenance Of Distribution System And Rising Main Pipeline (di/ci/upvc/hdpe), Rbtw, Stand Post, Fhtc And Operation Of Sluice Valve Of Water Supply Scheme
-Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipeline-(di/ci/upvc/hdpe),-Rbtw,-Stand-Post,-Fhtc-And-Operation-Of-Sluice-Valve-Of-Water-Supply-Scheme>2026-01-16
Philippines Construction Of Flood Mitigitaion Structures - Patagan Salvacion 2026-01-16
India Operation And Maintenance Of 11kv Substation Andother Electrical Mechanical Accessories At Wtp Surface Water Based Water Supply Scheme For Arsenic Affected Areas Of Raghunathganj-i Block Of Murshidabad District 2026-01-16
-Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipeline-(di/ci/upvc/hdpe),-Ground-Tube-Well,-Iep,-Stand-Post,-Fhtc-And-Operation-Of-Sluice-Valve-Of-Wat>India -Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipeline-(di/ci/upvc/hdpe),-Ground-Tube-Well,-Iep,-Stand-Post,-Fhtc-And-Operation-Of-Sluice-Valve-Of-Wat>Niet No. - 26 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte. (sl.no-39)
Day To Day Operation And Maintenance Of Distribution System And Rising Main Pipeline (di/ci/upvc/hdpe), Ground Tube Well, Iep, Stand Post, Fhtc And Operation Of Sluice Valve Of Wat
-Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipeline-(di/ci/upvc/hdpe),-Ground-Tube-Well,-Iep,-Stand-Post,-Fhtc-And-Operation-Of-Sluice-Valve-Of-Wat>2026-01-16
Whats app