Filter Search


Asia-Pacific


Location Summary Deadline
India Madurai-virudunagar - Vanchi Maniyachchi (up & Dn Line) And Virudunagar - tenkasi Section :- Proposed Through Weld Renewal (twr) By Mobile Flash Butt welding (mbfw) For A Length Of 79.300 Km In Sse/p.way/virudunagar & Sivakasi section. 2025-06-23
India Provision Of Railnet Connectivity At Various Points Coaching Depot At Ash, Bny & gtnr In Ljn Div 2025-06-23
India Tsr(p) -11.9 Km, Casual Renewal Of Rail -4 Km & Casual Renewal Of Sleepers 3 Km , ctr(p)- 1 Km In Yards, Renewal Of Sej With Twsej And Glued Joints, Ttr(tsr) & Ttr (tws+wcms) , Tfr - 6.1 Km And Ttr(tfr) In Aden/klbg Section Under Sr.den(s) sur Jurisdictio 2025-06-23
India Authorization Of Stba At,,nsg-6 Category Station Parsatiwari 2025-06-23
India Repair, Replacement And Restoration Of Smps Based Integrated Power Supply (ips) system Of Amara Raja Make Under The Jurisdiction Of Sr.dste/lmg. 2025-06-23
India 47.3 Km Tbr Work Under The Jurisdiction Of Aden/t/sur In Solapur Division 2025-06-23
India Repair, Replacement And Restoration Of Datalogger Of Efftronics Make Under The jurisdiction Of Sr.dste/lmg. 2025-06-23
India 1.improvements To Railway Hss School, Madurai. 2 Mdu-bdnk & Mdu-dg Section- extension Of Pf No. 1 At Usilampatti (uslp-nsg6) And Pf No. 2 At Vadipatti (vdp- nsg6) Station 3. Repairs To Compound Wall Around The Madurai Railway Colony. 4. mdu Division- Repa 2025-06-23
India Trr(p) -7 Km, Tsr(p) -12.71 Km, Casual Renewal Of Rail -4 Km & Casual Renewal Of sleepers 3 Km , Ctr(p)- 5.655km, Trr(p) -4.237 Km In Yards, Renewal Of Sej With twsej And Glued Joints, Ttr(tsr) & Ttr (tws+wcms) , Tfr - 36.13 Km And ttr(tfr) In Aden/sur(t) 2025-06-23
India Twin Single Line Between Kon & Mdu Stations With Ei Arrangements At Kon And mdu Stations. 2025-06-23
Whats app