Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of Pan Mortar 400 Mm Dia X75 Mm Deep, Corrosion Resistant Steel Irs M-41, Sheet Gauge 20, Weight 900 Gm Minimum With Engraved Stamp Of Wcr As Per Drawing Attached. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 2026-01-15
India Proposal For Selection Of Private Partner For Establishment Operation Maintenance And Management Of Fair Price Medicine Shops For Drugs Medicines Consumables At Hariharpur Bphc Baruipur Block South 24 Parganas 2026-01-15
India Cable 27 Conductor. .#* Cable 27 Conductor To Emd Part No. 40052869 Emd Blw Drawing No.40052869 Alt Ni l. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permi 2026-01-15
-Supply,-Installation,-Commissioning-And-Testing-Of-Smoke-Detector,-Beam-Detector,-Mcp,-Other-Fire-Alarm-Device,-Laying-Of-Cable-And-Integration-Of-Same-With-Existing-Notifier-3030-Control-Panel-At-Hwp(k)-(phase-2).>India -Supply,-Installation,-Commissioning-And-Testing-Of-Smoke-Detector,-Beam-Detector,-Mcp,-Other-Fire-Alarm-Device,-Laying-Of-Cable-And-Integration-Of-Same-With-Existing-Notifier-3030-Control-Panel-At-Hwp(k)-(phase-2).>Fire Alarm System Phase 2
Supply, Installation, Commissioning And Testing Of Smoke Detector, Beam Detector, Mcp, Other Fire Alarm Device, Laying Of Cable And Integration Of Same With Existing Notifier 3030 Control Panel At Hwp(k) (phase-2).
-Supply,-Installation,-Commissioning-And-Testing-Of-Smoke-Detector,-Beam-Detector,-Mcp,-Other-Fire-Alarm-Device,-Laying-Of-Cable-And-Integration-Of-Same-With-Existing-Notifier-3030-Control-Panel-At-Hwp(k)-(phase-2).>2026-01-15
India Rock Fall Protection, Slope Stabilisation And Other Ancillary Work To Protect The Rock falling Under Aden/bnda Section. 2026-01-15
India Nit 1379 Qdp 1499 Procurement Of 220kv Sf6 Gas Circuit Breaker 2026-01-15
India Recovery And Restoration Work Of Roads Due To Damages Occurred Due To Heavy Rainfall/flood. 2026-01-15
Philippines One Lot Lump Sum Contract For The Completion Of Unfinished Works For The Construction Of The Fourteen-storey New Training Building, Site Development And Various Site Improvements, Including Supply And 2026-01-15
Hong Kong Provision Of Cleansing And Supporting Services To Lantau District New 2026-01-15
-Construction-Of-Road-From-Manoranjan-Majhis-House-To-Bhaku-Gains-House-At-Laxmijanardhanpur-G.p.-Under-P.rpratima-P.s.-(2nd-Call-Of-Nit-104-Of-25-26,-Sl.-1)>India -Construction-Of-Road-From-Manoranjan-Majhis-House-To-Bhaku-Gains-House-At-Laxmijanardhanpur-G.p.-Under-P.rpratima-P.s.-(2nd-Call-Of-Nit-104-Of-25-26,-Sl.-1)>Wb/spg/zp/n-113/3/25-26
Construction Of Road From Manoranjan Majhis House To Bhaku Gains House At Laxmijanardhanpur G.p. Under P.rpratima P.s. (2nd Call Of Nit-104 Of 25-26, Sl. 1)
-Construction-Of-Road-From-Manoranjan-Majhis-House-To-Bhaku-Gains-House-At-Laxmijanardhanpur-G.p.-Under-P.rpratima-P.s.-(2nd-Call-Of-Nit-104-Of-25-26,-Sl.-1)>2026-01-15
Whats app