Filter Search


Asia-Pacific


Location Summary Deadline
-Payment-Of-Wage-For-Jalalpur-Water-Supply-Scheme-Under-Chanchal-Sub-division-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda-Period-From-01/08/2022-To-31/12/2023-.>India -Payment-Of-Wage-For-Jalalpur-Water-Supply-Scheme-Under-Chanchal-Sub-division-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda-Period-From-01/08/2022-To-31/12/2023-.>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_13
Payment Of Wage For Jalalpur Water Supply Scheme Under Chanchal Sub-division Under Malda Division, Phe Dte. In The District Of Malda Period From 01/08/2022 To 31/12/2023 .
-Payment-Of-Wage-For-Jalalpur-Water-Supply-Scheme-Under-Chanchal-Sub-division-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda-Period-From-01/08/2022-To-31/12/2023-.>2025-08-18
India Drivers Display Unit .#* Drivers Display Unit (ddu) As Per Clws Specification No. Clw/es/3/0487/c Or Latest For wap-7 And Wag-9 Locos [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-18
-Rectification-Or-Repairing-Of-Existing-Fhtc-In-Connection-With-Jal-Jeevan-Mission-(jjm-)-Command-Area-Of-Kendua-Water-Supply-Scheme-At-Chanchal-i-Block-Under-Malda-Division.-Phe-Dte.>India -Rectification-Or-Repairing-Of-Existing-Fhtc-In-Connection-With-Jal-Jeevan-Mission-(jjm-)-Command-Area-Of-Kendua-Water-Supply-Scheme-At-Chanchal-i-Block-Under-Malda-Division.-Phe-Dte.>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_14
Rectification Or Repairing Of Existing Fhtc In Connection With Jal Jeevan Mission (jjm ) Command Area Of Kendua Water Supply Scheme At Chanchal-i Block Under Malda Division. Phe Dte.
-Rectification-Or-Repairing-Of-Existing-Fhtc-In-Connection-With-Jal-Jeevan-Mission-(jjm-)-Command-Area-Of-Kendua-Water-Supply-Scheme-At-Chanchal-i-Block-Under-Malda-Division.-Phe-Dte.>2025-08-18
-Repair-And-Renovation-Of-Manikchak-Sub--District-Laboratory-Under-Manikchak-Block-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>India -Repair-And-Renovation-Of-Manikchak-Sub--District-Laboratory-Under-Manikchak-Block-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_15
Repair And Renovation Of Manikchak Sub- District Laboratory Under Manikchak Block Under Malda Division, Phe Dte, Govt. Of West Bengal.
-Repair-And-Renovation-Of-Manikchak-Sub--District-Laboratory-Under-Manikchak-Block-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>2025-08-18
-Repairing-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-40-Cum-Per-Hour,-Of-Dhanjana-Piped-Water-Supply-Scheme-At-Chanchal-i-Dev.-Block-Under-Malda-Division,-Phe-Dte.>India -Repairing-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-40-Cum-Per-Hour,-Of-Dhanjana-Piped-Water-Supply-Scheme-At-Chanchal-i-Dev.-Block-Under-Malda-Division,-Phe-Dte.>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_20
Repairing Of Iron Elimination Plant (pressure Type) Having Capacity 40 Cum Per Hour, Of Dhanjana Piped Water Supply Scheme At Chanchal-i Dev. Block Under Malda Division, Phe Dte.
-Repairing-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-40-Cum-Per-Hour,-Of-Dhanjana-Piped-Water-Supply-Scheme-At-Chanchal-i-Dev.-Block-Under-Malda-Division,-Phe-Dte.>2025-08-18
India Snubber Assembly For Bg (wag 5) Locos .#* Snubber Assembly For Bg (wag 5) Locos, Rdso Drg.no.skdl-2089a Alt.no.3, Ref. Lett. a,b, C, D, E, F, G & J Skdl-2091a Ref.no. A, B, C, D, E & F Alt-7, Skdl-3231 Alt.2, Skdl-3232 Alt-2, Skd l-3465 Alt-5, Skdl - 3058 2025-08-18
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-135-M3-Hr-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disposal>India -Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-135-M3-Hr-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disposal>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_27
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 135 M3 Hr Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room Backwash Water Disposal
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-135-M3-Hr-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash-Water-Disposal>2025-08-18
-Rectification-Or-Repairing-Of-Existing-Fhtc-In-Connection-For-Altor-Water-Supply-Scheme-At-Gazole-Dev.-Block-In-The-District-Malda-Under-Malda-Division.-Phe-Dte.>India -Rectification-Or-Repairing-Of-Existing-Fhtc-In-Connection-For-Altor-Water-Supply-Scheme-At-Gazole-Dev.-Block-In-The-District-Malda-Under-Malda-Division.-Phe-Dte.>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_03
Rectification Or Repairing Of Existing Fhtc In Connection For Altor Water Supply Scheme At Gazole Dev. Block In The District Malda Under Malda Division. Phe Dte.
-Rectification-Or-Repairing-Of-Existing-Fhtc-In-Connection-For-Altor-Water-Supply-Scheme-At-Gazole-Dev.-Block-In-The-District-Malda-Under-Malda-Division.-Phe-Dte.>2025-08-18
-Repairing-Of-Damaged-Pipeline-Including-Specials-And-Valves-For-Bulbulchandi-Piped-Water-Supply-Scheme-At-Habibpur-Block-Of-Malda-District-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>India -Repairing-Of-Damaged-Pipeline-Including-Specials-And-Valves-For-Bulbulchandi-Piped-Water-Supply-Scheme-At-Habibpur-Block-Of-Malda-District-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_04
Repairing Of Damaged Pipeline Including Specials And Valves For Bulbulchandi Piped Water Supply Scheme At Habibpur Block Of Malda District Under Malda Division, Phe Dte, Govt. Of West Bengal.
-Repairing-Of-Damaged-Pipeline-Including-Specials-And-Valves-For-Bulbulchandi-Piped-Water-Supply-Scheme-At-Habibpur-Block-Of-Malda-District-Under-Malda-Division,-Phe-Dte,-Govt.-Of-West-Bengal.>2025-08-18
-Development-Of-Tubewells-By-Using-Suitable-Air-Compressor-Method-At-Different-Ramnagar-Pwss-Tw-No.-I-Ii---2-Nos,bamangram-Pwss-Tw-No.-I-Ii-Iii---3-Nos,-Mirzapur-Pwss-Tw-No.-Ii---1-Nos-Water-Supply-Schemes-Un>India -Development-Of-Tubewells-By-Using-Suitable-Air-Compressor-Method-At-Different-Ramnagar-Pwss-Tw-No.-I-Ii---2-Nos,bamangram-Pwss-Tw-No.-I-Ii-Iii---3-Nos,-Mirzapur-Pwss-Tw-No.-Ii---1-Nos-Water-Supply-Schemes-Un>Wbphed/ee/md/niet24 Of 2025-2026,sl_no_06
Development Of Tubewells By Using Suitable Air Compressor Method At Different Ramnagar Pwss Tw No. I Ii - 2 Nos,bamangram Pwss Tw No. I Ii Iii - 3 Nos, Mirzapur Pwss Tw No. Ii - 1 Nos Water Supply Schemes Un
-Development-Of-Tubewells-By-Using-Suitable-Air-Compressor-Method-At-Different-Ramnagar-Pwss-Tw-No.-I-Ii---2-Nos,bamangram-Pwss-Tw-No.-I-Ii-Iii---3-Nos,-Mirzapur-Pwss-Tw-No.-Ii---1-Nos-Water-Supply-Schemes-Un>2025-08-18
Whats app