Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Boundary Wall At Karanjora Msk Jl-01, Mouza-karanjora Under Mankanali Gp Under Apas Scheme 2025 26 Under Bankura Ii Dev Block (activity Id - Apas/01/252/4/0004) 2026-01-05
India Rake .#* Item Names: Rake 2026-01-05
-Construction-Of-One-Culvert-At-2-Nos-Road-Connection-Of-Mir-Hossain-Ali-House-Uttar>India -Construction-Of-One-Culvert-At-2-Nos-Road-Connection-Of-Mir-Hossain-Ali-House-Uttar>101/aus-ii/bdo/booth-131/25-26
Construction Of One Culvert At 2 Nos Road Connection Of Mir Hossain Ali House Uttar
-Construction-Of-One-Culvert-At-2-Nos-Road-Connection-Of-Mir-Hossain-Ali-House-Uttar>2026-01-05
-Annual-Maintenance-Of-Whole-Distribution-System-Of-Zone-9b-Under-Added-Area-Of-Siliguri-Municipal-Water-Supply-Scheme-Including-Operation-Of-Valves-For-Zone-9b-Under-Siliguri-W/s-Division-P.h.e.dte.-For-T>India -Annual-Maintenance-Of-Whole-Distribution-System-Of-Zone-9b-Under-Added-Area-Of-Siliguri-Municipal-Water-Supply-Scheme-Including-Operation-Of-Valves-For-Zone-9b-Under-Siliguri-W/s-Division-P.h.e.dte.-For-T>Phe/swsd/ee/niet- 19 Of 2025-26 (sl.no. 12 )
Annual Maintenance Of Whole Distribution System Of Zone-9b Under Added Area Of Siliguri Municipal Water Supply Scheme Including Operation Of Valves For Zone-9b Under Siliguri W/s Division P.h.e.dte. For T
-Annual-Maintenance-Of-Whole-Distribution-System-Of-Zone-9b-Under-Added-Area-Of-Siliguri-Municipal-Water-Supply-Scheme-Including-Operation-Of-Valves-For-Zone-9b-Under-Siliguri-W/s-Division-P.h.e.dte.-For-T>2026-01-05
India Auction Of Residential House Residential House 2026-01-05
India 25 Kv Earthing Discharge Rod Made Of Resin Bonded Fiber As Per Rdso.spec. No. eti/ohe/51(9/87) Rev-1 With A&c Slip Np. 1 (10/92) Or Latest. Complete With Cable, earthing Rail Clamps 02 Nos. Earthing Rail Clamps Suitable For 36mm To 50mm Dia. busbar Cable 2026-01-05
-Renovation-And-Modification-Of-4th-Floor-Of-Existing-Haj-Tower-At-Kaikhali-Kolkata-Under-Kolkata-North-Division-P-W-D-In-The-District-Of-North-24-Pgs-During-The-Financial-Year-25-26>India -Renovation-And-Modification-Of-4th-Floor-Of-Existing-Haj-Tower-At-Kaikhali-Kolkata-Under-Kolkata-North-Division-P-W-D-In-The-District-Of-North-24-Pgs-During-The-Financial-Year-25-26>Wbpwd/ee/knd/niet-25/2025-2026
Renovation And Modification Of 4th Floor Of Existing Haj Tower At Kaikhali Kolkata Under Kolkata North Division P W D In The District Of North 24 Pgs During The Financial Year 25 26
-Renovation-And-Modification-Of-4th-Floor-Of-Existing-Haj-Tower-At-Kaikhali-Kolkata-Under-Kolkata-North-Division-P-W-D-In-The-District-Of-North-24-Pgs-During-The-Financial-Year-25-26>2026-01-05
China Procurement Of Medium-sized High-performance R&d Comprehensive Drying Room System For Beijing Institute Of Technology 2026-01-05
India Const Of Concrete Road Fromjagannath Das House To Sanker Das House 2026-01-05
India Current Transformer Tfilm Etc. .#* Current Transformer Tfilm To Clws Spec. No-clw/es/t-27 (alt.- 0) [ Warranty period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: 2026-01-05
Whats app