Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Concrete-Road-From-Serangrampur-Panchu-Das-House-To-Santosh-Kayal-House-Via-Serangrampur-Ray-Para-Sishu-Siksha-Kendra>India -Construction-Of-Concrete-Road-From-Serangrampur-Panchu-Das-House-To-Santosh-Kayal-House-Via-Serangrampur-Ray-Para-Sishu-Siksha-Kendra>Wbsdb/ee/ced-i/nit-12(e)/24-25 Sl-1
Construction Of Concrete Road From Serangrampur Panchu Das House To Santosh Kayal House Via Serangrampur Ray Para Sishu Siksha Kendra
-Construction-Of-Concrete-Road-From-Serangrampur-Panchu-Das-House-To-Santosh-Kayal-House-Via-Serangrampur-Ray-Para-Sishu-Siksha-Kendra>2024-11-28
India Supply Of Cover For Whel Set Earthing Equipment For Lhb Type Coaches To Rcf Drg. No.lw71234, Alt.c [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Ma 2024-11-28
Russian Federation 907-s150-24/693 Security Systems 2024-11-28
Japan Use Of One Set Of Sage Journals (part 1: January To March 2025) And (part 2: April To December 2025) 2024-11-28
Korea Republic of Basic Design Competition For The Construction Of The New Yeoju City Hall 2024-11-28
Russian Federation 907-s150-24/607 Printers, Multifunctional Devices 2024-11-28
-Control-Portion,-Er-(ercp)-As-Per-Kbil-Part-No.787776-1994-For-Ccb-Brake-System-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Control-Portion,-Er-(ercp)-As-Per-Kbil-Part-No.787776-1994-For-Ccb-Brake-System-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Control Portion, Er (ercp)
Control Portion, Er (ercp) As Per Kbil Part No.787776-1994 For Ccb Brake System [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Control-Portion,-Er-(ercp)-As-Per-Kbil-Part-No.787776-1994-For-Ccb-Brake-System-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-28
India Repairing And Maintenance Of Govt. Vehicles 2024-11-28
Thailand Construction Of Expansion Area - Improvement Of Power Distribution System, Basco Intertrade Co., Ltd. work Number (wbs) C-67-h-pntcs.0263 2024-11-28
-Poh-Maintenance-Schedule-Of-N-32-Tap-Changer-Consisting-Of-50-Nos.-Un-common-Items-+-23-Nos.hardware-Items-=-73-Nos-Items-Of-M/s.-Repl-Make-(bt-Type)-As-Per-Annexure.-[-Warranty-Period:-30-Month>India -Poh-Maintenance-Schedule-Of-N-32-Tap-Changer-Consisting-Of-50-Nos.-Un-common-Items-+-23-Nos.hardware-Items-=-73-Nos-Items-Of-M/s.-Repl-Make-(bt-Type)-As-Per-Annexure.-[-Warranty-Period:-30-Month>Supply Of Poh Maintenance Schedule Of N-32 Tap Changer
Poh Maintenance Schedule Of N-32 Tap Changer Consisting Of 50 Nos. Un-common Items + 23 Nos.hardware Items = 73 Nos Items Of M/s. Repl Make (bt Type) As Per Annexure. [ Warranty Period: 30 Month
-Poh-Maintenance-Schedule-Of-N-32-Tap-Changer-Consisting-Of-50-Nos.-Un-common-Items-+-23-Nos.hardware-Items-=-73-Nos-Items-Of-M/s.-Repl-Make-(bt-Type)-As-Per-Annexure.-[-Warranty-Period:-30-Month>2024-11-28
Whats app