Filter Search


Asia-Pacific


Location Summary Deadline
Japan Akita Expressway Yokote Construction 2024-11-20
-Pipe-Assembly-Water-Discharge-Left-Bank-Drawing-No.9546040-Alt-Ab-Or-Latest.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Pipe-Assembly-Water-Discharge-Left-Bank-Drawing-No.9546040-Alt-Ab-Or-Latest.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Pipe Assembly Water Discharge Left Bank
Pipe Assembly Water Discharge Left Bank Drawing No.9546040 Alt Ab Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Pipe-Assembly-Water-Discharge-Left-Bank-Drawing-No.9546040-Alt-Ab-Or-Latest.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-20
Japan Radiation Treatment Planning System Set 2024-11-20
Korea Republic of Gumi Industrial Complex Urban Regeneration Innovation District Construction Project 2024-11-20
-Modified-Adapter-To-Be-Used-With-Elastomeric-Pads-For-Casnub-Bogie-To-Rdso's-Drg.-No.-Wd-85053/s-1,-Alt.-No.--8-Rdso's-Str-No.-Ab/rb-40-2016-(rev.-2)-Of>India -Modified-Adapter-To-Be-Used-With-Elastomeric-Pads-For-Casnub-Bogie-To-Rdso's-Drg.-No.-Wd-85053/s-1,-Alt.-No.--8-Rdso's-Str-No.-Ab/rb-40-2016-(rev.-2)-Of>Supply Of Procurement Of Modified Adapter To Be Used With Elastomeric Pads For Casnub Bogie Etc.
Modified Adapter To Be Used With Elastomeric Pads For Casnub Bogie To Rdso's Drg. No. Wd-85053/s-1, Alt. No. -8 Rdso's Str No. Ab/rb-40-2016 (rev. 2) Of
-Modified-Adapter-To-Be-Used-With-Elastomeric-Pads-For-Casnub-Bogie-To-Rdso's-Drg.-No.-Wd-85053/s-1,-Alt.-No.--8-Rdso's-Str-No.-Ab/rb-40-2016-(rev.-2)-Of>2024-11-20
-Link-(modified)-Of-Wag7-Loco-As-Per-Clw's-Drg.-No.--06/4/15/69.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Link-(modified)-Of-Wag7-Loco-As-Per-Clw's-Drg.-No.--06/4/15/69.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Link (modified) Of Wag7 Loco Etc
Link (modified) Of Wag7 Loco As Per Clw's Drg. No.- 06/4/15/69. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Link-(modified)-Of-Wag7-Loco-As-Per-Clw's-Drg.-No.--06/4/15/69.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-20
Japan Provision Of Rpa Licenses Related To The 5th Customs Information Comprehensive Judgment System (5th Cis) 2024-11-20
Japan Construction And Installation Of Display Cases In The New Wings (2nd Floor), Nara National Museum 2024-11-20
-Blower-Scavange-For-Machine-Room.-As-Per-Clw-Specn.no.-Clw/es/3/0022/e-Orlatest-For-3-phase-Loco-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Blower-Scavange-For-Machine-Room.-As-Per-Clw-Specn.no.-Clw/es/3/0022/e-Orlatest-For-3-phase-Loco-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Blower Scavange For Machine Room
Blower Scavange For Machine Room. As Per Clw Specn.no. Clw/es/3/0022/e Orlatest For 3-phase Loco [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Blower-Scavange-For-Machine-Room.-As-Per-Clw-Specn.no.-Clw/es/3/0022/e-Orlatest-For-3-phase-Loco-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-20
-Clay-Bentonite.-As-Per-Specification-No:-Sf/spec/bentonite,-Rev.-6,-Dt.17/6/2015,-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variatio>India -Clay-Bentonite.-As-Per-Specification-No:-Sf/spec/bentonite,-Rev.-6,-Dt.17/6/2015,-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variatio>Supply Of Clay Bentonite.
Clay Bentonite. As Per Specification No: Sf/spec/bentonite, Rev.-6, Dt.17/6/2015, [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variatio
-Clay-Bentonite.-As-Per-Specification-No:-Sf/spec/bentonite,-Rev.-6,-Dt.17/6/2015,-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variatio>2024-11-20
Whats app